Factors influencing the construction time of public sector civil engineering projects in Malaysia // Ahmad Anuar Othman
Material type: TextPublication details: Kuala Lumpur : Universiti Teknologi Mara, 2006Description: 518p., : illust, 30cmSubject(s):Item type | Current library | Collection | Call number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|
Tesis | JPS HQ Library Main Library | General Collections | THESIS CE 624 AHM (Browse shelf(Opens below)) | Available | 1000029657 | ||
Tesis | JPS HQ Library Main Library | Red Spot | THESIS CE 624 AHM (Browse shelf(Opens below)) | Available | 1000033584 |
Thesis submitted in fulfilment of the requirements for the degree of Doctor of Philosophy.
CHAPTER 1: Introduction. CHAPTER 2: Literature review on general overview of construction industry. CHAPTER 3: Literature review on construction time performance and project delay. CHAPTER 4: Review of research method and development of reasearch methodology. CHAPTER 5: The first phase study. CHAPTER 6: The second phase study. Chapter 7: The phase study. CHAPTER 8: Discussion of the Findings. CHAPTER 9: Conclusion and recommendations.
eng
There are no comments on this title.