Factors influencing the construction time of public sector civil engineering projects in Malaysia //

Ahmad Anuar Othman

Factors influencing the construction time of public sector civil engineering projects in Malaysia // Ahmad Anuar Othman - Kuala Lumpur : Universiti Teknologi Mara, 2006 - 518p., : illust, 30cm

Thesis submitted in fulfilment of the requirements for the degree of Doctor of Philosophy.

CHAPTER 1: Introduction. CHAPTER 2: Literature review on general overview of construction industry. CHAPTER 3: Literature review on construction time performance and project delay. CHAPTER 4: Review of research method and development of reasearch methodology. CHAPTER 5: The first phase study. CHAPTER 6: The second phase study. Chapter 7: The phase study. CHAPTER 8: Discussion of the Findings. CHAPTER 9: Conclusion and recommendations.


eng


Civil engineering--Malaysia

HUBUNGI KAMI

Perpustakaan Jabatan Pengairan dan Saliran Malaysia (JPS Malaysia)
Aras Bawah, Blok A, Kompleks Ibu Pejabat JPS Malaysia
Persiaran Rimba Permai, Cyber 8
63000 Cyberjaya, Selangor

No Tel : 03 – 2697 3050

Emel : adminlibrary@water.gov.my

MEDIA SOSIAL


KAUNTER PELAWAT

HARI INI MINGGU LEPAS BULAN LEPAS TAHUN LEPAS JUMLAH
today lastweek lastmonth lastyear total

WAKTU PERKHIDMATAN

   Isnin - Khamis  :  8.00 pagi – 5.00 petang
   Jumaat  :  8.00 pagi – 12.15 tengah hari
     2.45 petang - 5.00 petang

   Sabtu, Ahad & Cuti Umum: TUTUP


Paparan terbaik menggunakan Google Chrome dan mozila firefox dengan resolusi 1600 X 900
Hakcipta Terpelihara @2023, Perpustakaan JPS Malaysia
Penafian :Kerajaan Malaysia dan Pihak Jabatan Pengairan dan Saliran Malaysia tidak bertanggungjawab terhadap sebarang kerugian atau kerosakan yang dialami kerana menggunakan maklumat dalam portal ini.

Powered by Koha