Fill dam Volume 2: Engineering manual for irrigation and drainage
Material type: TextPublication details: The Institute of Irrigation and Drainage, 19--Description: 383-534p; illust. 26cmSubject(s):Item type | Current library | Collection | Call number | Copy number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|---|
Monograf | JPS HQ Library Main Library | General Collections | DAM 627.82 FIL (Browse shelf(Opens below)) | 1 | Available | 1000022867 |
CONSTRUCTION WORK. Construction Plan and Supervision. The Construction Plan. Construction Supervision. Construction. Preparatory Works and Construction. Facilities. Temporary Diversion Works. Excavation of Dam Base. Foundation Treatment. Fill Dam Embankments. Concrete Structures. Installation of Facilities. SUPERVISION. Initial Ponding of Reservoir. Initial Ponding of Reservoir. Supervision of the Ponding Process. Operation and Maintenance. Operation and Maintenance of Structures. Operational Supervision
eng/jpn
There are no comments on this title.