Fill dam Volume 2: Engineering manual for irrigation and drainage

Fill dam Volume 2: Engineering manual for irrigation and drainage - The Institute of Irrigation and Drainage, 19-- - 383-534p; illust. 26cm

CONSTRUCTION WORK. Construction Plan and Supervision. The Construction Plan. Construction Supervision. Construction. Preparatory Works and Construction. Facilities. Temporary Diversion Works. Excavation of Dam Base. Foundation Treatment. Fill Dam Embankments. Concrete Structures. Installation of Facilities. SUPERVISION. Initial Ponding of Reservoir. Initial Ponding of Reservoir. Supervision of the Ponding Process. Operation and Maintenance. Operation and Maintenance of Structures. Operational Supervision


eng/jpn


DAM.

HUBUNGI KAMI

Perpustakaan Jabatan Pengairan dan Saliran Malaysia (JPS Malaysia)
Aras Bawah, Blok A, Kompleks Ibu Pejabat JPS Malaysia
Persiaran Rimba Permai, Cyber 8
63000 Cyberjaya, Selangor

No Tel : 03 – 2697 3050

Emel : adminlibrary@water.gov.my

MEDIA SOSIAL


KAUNTER PELAWAT

HARI INI MINGGU LEPAS BULAN LEPAS TAHUN LEPAS JUMLAH
today lastweek lastmonth lastyear total

WAKTU PERKHIDMATAN

   Isnin - Khamis  :  8.00 pagi – 5.00 petang
   Jumaat  :  8.00 pagi – 12.15 tengah hari
     2.45 petang - 5.00 petang

   Sabtu, Ahad & Cuti Umum: TUTUP


Paparan terbaik menggunakan Google Chrome dan mozila firefox dengan resolusi 1600 X 900
Hakcipta Terpelihara @2023, Perpustakaan JPS Malaysia
Penafian :Kerajaan Malaysia dan Pihak Jabatan Pengairan dan Saliran Malaysia tidak bertanggungjawab terhadap sebarang kerugian atau kerosakan yang dialami kerana menggunakan maklumat dalam portal ini.

Powered by Koha