Amazon cover image
Image from Amazon.com

IMPLEMENTING CONCURRENT PROJECT MANAGEMENT

By: Material type: TextTextPublication details: NEW JERSEY: PRENTICE HALL, 1994Description: 222P; ILLUSTISBN:
  • 0133020010
Subject(s):
Contents:
1. Concurrent new product development. 1.1 Introduction. 1.2 Hierarchy of organizations. 1.3 Hierarchy of concurrent product development. 1.4 Comparison with traditional process. 1.5 Motivation for concurrent new product development. 1.6 The people involved. 1.7 The psychology of human behavior in concurrent project management. 1.8 Top management must change, first. 1.9 Product champions. 1.10 Case studies- A reference to chapter 9. 1.10 Implementation of concurrent project management. 1.11 Total quality management. 1.12 Problems. 2. Concurrent planning. 2.1 Introduction. 2.2 Functional specification. 2.3 The project description. 2.4 The plan network. 2.5 Problems. 3. Concurrent scheduling. 3.1 Introduction. 3.2 Definitions. 3.3 Calculating activity durations. 3.4 Determining the critical path. 3.5 The more meaningful project schedules 3.6 Parallel paths. 3.7 Activity slack. 3.8 Problems. 4. Concurrent scheduling part2" resources allocation. 4.1 Introduction 4.2 Resources allocation. 4.3 Problems. 5. Cost. 5.1 Introduction 5.2 Generation of the predicted cost. 6. The report/ proposal. 7. Multiple projects. 7.1 Introduction 7.2 The procedure. 7.3 The Procedure applied to three simulataneous projects. 8. Concurrent control. 8.1 Introduction 8.2 Decision making 8.3 Additional suggestion 8.3 Observation 8.4 Control 8.5 Reporting progress and status. 9. Case studies. 9.1 Introduction. 9.2 Column gauge 9.3 Dial bore gauge. 9.4 Laser surgical system. 9.5 IBM proprinter.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode
Monograf JPS HQ Library Main Library General Collections MGT 658.5 TUR (Browse shelf(Opens below)) 1 Available 1000000293

1. Concurrent new product development. 1.1 Introduction. 1.2 Hierarchy of organizations. 1.3 Hierarchy of concurrent product development. 1.4 Comparison with traditional process. 1.5 Motivation for concurrent new product development. 1.6 The people involved. 1.7 The psychology of human behavior in concurrent project management. 1.8 Top management must change, first. 1.9 Product champions. 1.10 Case studies- A reference to chapter 9. 1.10 Implementation of concurrent project management. 1.11 Total quality management. 1.12 Problems. 2. Concurrent planning. 2.1 Introduction. 2.2 Functional specification. 2.3 The project description. 2.4 The plan network. 2.5 Problems. 3. Concurrent scheduling. 3.1 Introduction. 3.2 Definitions. 3.3 Calculating activity durations. 3.4 Determining the critical path. 3.5 The more meaningful project schedules 3.6 Parallel paths. 3.7 Activity slack. 3.8 Problems. 4. Concurrent scheduling part2" resources allocation. 4.1 Introduction 4.2 Resources allocation. 4.3 Problems. 5. Cost. 5.1 Introduction 5.2 Generation of the predicted cost. 6. The report/ proposal. 7. Multiple projects. 7.1 Introduction 7.2 The procedure. 7.3 The Procedure applied to three simulataneous projects. 8. Concurrent control. 8.1 Introduction 8.2 Decision making 8.3 Additional suggestion 8.3 Observation 8.4 Control 8.5 Reporting progress and status. 9. Case studies. 9.1 Introduction. 9.2 Column gauge 9.3 Dial bore gauge. 9.4 Laser surgical system. 9.5 IBM proprinter.

ENG

There are no comments on this title.

to post a comment.

HUBUNGI KAMI

Perpustakaan Jabatan Pengairan dan Saliran Malaysia (JPS Malaysia)
Aras Bawah, Blok A, Kompleks Ibu Pejabat JPS Malaysia
Persiaran Rimba Permai, Cyber 8
63000 Cyberjaya, Selangor

No Tel : 03 – 2697 3050

Emel : adminlibrary@water.gov.my

MEDIA SOSIAL


KAUNTER PELAWAT

HARI INI MINGGU LEPAS BULAN LEPAS TAHUN LEPAS JUMLAH
today lastweek lastmonth lastyear total

WAKTU PERKHIDMATAN

   Isnin - Khamis  :  8.00 pagi – 5.00 petang
   Jumaat  :  8.00 pagi – 12.15 tengah hari
     2.45 petang - 5.00 petang

   Sabtu, Ahad & Cuti Umum: TUTUP


Paparan terbaik menggunakan Google Chrome dan mozila firefox dengan resolusi 1600 X 900
Hakcipta Terpelihara @2023, Perpustakaan JPS Malaysia
Penafian :Kerajaan Malaysia dan Pihak Jabatan Pengairan dan Saliran Malaysia tidak bertanggungjawab terhadap sebarang kerugian atau kerosakan yang dialami kerana menggunakan maklumat dalam portal ini.

Powered by Koha