HYDRAULIC MODEL INVESTIGATION OF `GABION' PROTECTION OF CULVERT OUTLETS / R.T. HATTERSLEY AND B.A. CORNISH

By: Contributor(s): Material type: TextTextPublication details: New South Wales : The University of New South Wales, 1961Description: 10p ; illusSubject(s):
Contents:
1 - Introduction 2 - Some general considerations in design of a non-rigid apron 3 - Conditions of operation of model tests for culverts 3.1 - Bed material 3.2 - Scour pattern 3.3 - Stability of structure 3.4 - Prototype - Model relationships 3.5 - Downstream conditions 3.51 - Channel width 3.52 - Tailwater 4 - Stability of the 'Gabion' mat 4.1 - General 4.2 - Test program 4.3 - Test result 4.31 - General 4.32 - Dimensions of 'Gabion' mats 4.33 - Scour profile 4.34 - Scale verification 5 - Prototype 'Gabions' 5.1 - General 5.2 - Recommended construction procedure for 'Gabion' mat 6 - Deflectors 6.1 - General 6.2 - Deflecting Splitter 6.3 - Hanging deflector 6.31 - General 6.32 - Prototype weight 6.33 - Test results 6.34 - Blockage by flood debris 6.35 - Effect of deflectors on discharge capacity 7 - Conclusion .
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode
Monograf JPS HQ Library Main Library General Collections HYDR 626.745 HAT (Browse shelf(Opens below)) 1 Available 1000003461

1 - Introduction 2 - Some general considerations in design of a non-rigid apron 3 - Conditions of operation of model tests for culverts 3.1 - Bed material 3.2 - Scour pattern 3.3 - Stability of structure 3.4 - Prototype - Model relationships 3.5 - Downstream conditions 3.51 - Channel width 3.52 - Tailwater 4 - Stability of the 'Gabion' mat 4.1 - General 4.2 - Test program 4.3 - Test result 4.31 - General 4.32 - Dimensions of 'Gabion' mats 4.33 - Scour profile 4.34 - Scale verification 5 - Prototype 'Gabions' 5.1 - General 5.2 - Recommended construction procedure for 'Gabion' mat 6 - Deflectors 6.1 - General 6.2 - Deflecting Splitter 6.3 - Hanging deflector 6.31 - General 6.32 - Prototype weight 6.33 - Test results 6.34 - Blockage by flood debris 6.35 - Effect of deflectors on discharge capacity 7 - Conclusion .

ENG

There are no comments on this title.

to post a comment.

HUBUNGI KAMI

Perpustakaan Jabatan Pengairan dan Saliran Malaysia (JPS Malaysia)
Aras Bawah, Blok A, Kompleks Ibu Pejabat JPS Malaysia
Persiaran Rimba Permai, Cyber 8
63000 Cyberjaya, Selangor

No Tel : 03 – 2697 3050

Emel : adminlibrary@water.gov.my

MEDIA SOSIAL


KAUNTER PELAWAT

HARI INI MINGGU LEPAS BULAN LEPAS TAHUN LEPAS JUMLAH
today lastweek lastmonth lastyear total

WAKTU PERKHIDMATAN

   Isnin - Khamis  :  8.00 pagi – 5.00 petang
   Jumaat  :  8.00 pagi – 12.15 tengah hari
     2.45 petang - 5.00 petang

   Sabtu, Ahad & Cuti Umum: TUTUP


Paparan terbaik menggunakan Google Chrome dan mozila firefox dengan resolusi 1600 X 900
Hakcipta Terpelihara @2023, Perpustakaan JPS Malaysia
Penafian :Kerajaan Malaysia dan Pihak Jabatan Pengairan dan Saliran Malaysia tidak bertanggungjawab terhadap sebarang kerugian atau kerosakan yang dialami kerana menggunakan maklumat dalam portal ini.

Powered by Koha