Feasibility Study And Detailed Design On River Systems Of Sg. Perai, Sg. Juru And Sg. Jejawi - Sg. Tengah: Phase 1 - Feasibility Study, Final Report, Vol.5 - Supporting Report (Environmental Impact Assessment)

By: Material type: TextTextPublication details: Jurutera Konsultant (SEA) Sdn. Bhd. 1994Description: pSubject(s):
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode
Laporan Kajian JPS HQ Library Main Library General Collections CS-PP041 (Browse shelf(Opens below)) 1 Available 1000025135
Laporan Kajian JPS HQ Library Main Library General Collections CS-PP041 (Browse shelf(Opens below)) 1 Available 1000016788
Laporan Kajian JPS HQ Library Main Library General Collections CS-PP041 (Browse shelf(Opens below)) 1 Available 1000024914
Browsing JPS HQ Library shelves, Shelving location: Main Library, Collection: General Collections Close shelf browser (Hides shelf browser)
No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available
CS-PP040 Feasibility Study And Detailed Design On River Systems Of Sg. Perai, Sg. Juru And Sg. Jejawi - Sg. Tengah: Phase 1 - Feasibility Study, Final Report, Vol.4 - Supporting Report (Hydrology) CS-PP041 Feasibility Study And Detailed Design On River Systems Of Sg. Perai, Sg. Juru And Sg. Jejawi - Sg. Tengah: Phase 1 - Feasibility Study, Final Report, Vol.5 - Supporting Report (Environmental Impact Assessment) CS-PP041 Feasibility Study And Detailed Design On River Systems Of Sg. Perai, Sg. Juru And Sg. Jejawi - Sg. Tengah: Phase 1 - Feasibility Study, Final Report, Vol.5 - Supporting Report (Environmental Impact Assessment) CS-PP041 Feasibility Study And Detailed Design On River Systems Of Sg. Perai, Sg. Juru And Sg. Jejawi - Sg. Tengah: Phase 1 - Feasibility Study, Final Report, Vol.5 - Supporting Report (Environmental Impact Assessment) CS-PP042 Georgetown Conurbation Flood Mitigation And Drainage Project: Detailed Design - Final Report, Main Report CS-PP042 Georgetown Conurbation Flood Mitigation And Drainage Project: Detailed Design - Final Report, Main Report CS-PP043 Georgetown Conurbation Flood Mitigation And Drainage Project: Detailed Design - Final Report, Annex A - Site Analysis And Conceptual Planning Report For Landscaping Works

There are no comments on this title.

to post a comment.

HUBUNGI KAMI

Perpustakaan Jabatan Pengairan dan Saliran Malaysia (JPS Malaysia)
Aras Bawah, Blok A, Kompleks Ibu Pejabat JPS Malaysia
Persiaran Rimba Permai, Cyber 8
63000 Cyberjaya, Selangor

No Tel : 03 – 2697 3050

Emel : adminlibrary@water.gov.my

MEDIA SOSIAL


KAUNTER PELAWAT

HARI INI MINGGU LEPAS BULAN LEPAS TAHUN LEPAS JUMLAH
today lastweek lastmonth lastyear total

WAKTU PERKHIDMATAN

   Isnin - Khamis  :  8.00 pagi – 5.00 petang
   Jumaat  :  8.00 pagi – 12.15 tengah hari
     2.45 petang - 5.00 petang

   Sabtu, Ahad & Cuti Umum: TUTUP


Paparan terbaik menggunakan Google Chrome dan mozila firefox dengan resolusi 1600 X 900
Hakcipta Terpelihara @2023, Perpustakaan JPS Malaysia
Penafian :Kerajaan Malaysia dan Pihak Jabatan Pengairan dan Saliran Malaysia tidak bertanggungjawab terhadap sebarang kerugian atau kerosakan yang dialami kerana menggunakan maklumat dalam portal ini.

Powered by Koha