THE SUPERVISION OF CIVIL ENGINEERING CONSTRUCTION

By: Material type: TextTextPublication details: London: Edward Arnold Ltd, 1955Description: pSubject(s):
Contents:
Part 1: Site organization. Chapter 1: Types of contract and organization. Chapter 2: The Duties of the resident engineer. Chapter 3: The first few days on works. Chapter 4: Programme and process charts. Chapter 5: Offices records. Part 2: The work progresses. Chapter 6: Setting out, excavations and foundations. Chapter 7: Concrete site work. Chapter 8: Steel reinforcement in concrete. Chapter 9: Brickwork damp-proof courses, renderings, partitions, stonework and roofing. Chapter 10: Flooring, tiling windows, doors. Chapter 11: Sub-contract and prime cost items, heating, lighting and plumbing. Chapter 12: Pipe- lying. Chapter 13: Trials, tribulations and lost tempers. Chapter 14: Claims. Part 3: Preparation of contract documents. Chapter 15: Specifications. Chapter 16: Bills of quantities. Chapter 17: Drawings. Chapter 18: Conclusion.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode
Monograf JPS HQ Library Main Library General Collections SOS 347.49 TWO (Browse shelf(Opens below)) 1 Available 1000000873

Part 1: Site organization. Chapter 1: Types of contract and organization. Chapter 2: The Duties of the resident engineer. Chapter 3: The first few days on works. Chapter 4: Programme and process charts. Chapter 5: Offices records. Part 2: The work progresses. Chapter 6: Setting out, excavations and foundations. Chapter 7: Concrete site work. Chapter 8: Steel reinforcement in concrete. Chapter 9: Brickwork damp-proof courses, renderings, partitions, stonework and roofing. Chapter 10: Flooring, tiling windows, doors. Chapter 11: Sub-contract and prime cost items, heating, lighting and plumbing. Chapter 12: Pipe- lying. Chapter 13: Trials, tribulations and lost tempers. Chapter 14: Claims. Part 3: Preparation of contract documents. Chapter 15: Specifications. Chapter 16: Bills of quantities. Chapter 17: Drawings. Chapter 18: Conclusion.

ENG

There are no comments on this title.

to post a comment.

HUBUNGI KAMI

Perpustakaan Jabatan Pengairan dan Saliran Malaysia (JPS Malaysia)
Aras Bawah, Blok A, Kompleks Ibu Pejabat JPS Malaysia
Persiaran Rimba Permai, Cyber 8
63000 Cyberjaya, Selangor

No Tel : 03 – 2697 3050

Emel : adminlibrary@water.gov.my

MEDIA SOSIAL


KAUNTER PELAWAT

HARI INI MINGGU LEPAS BULAN LEPAS TAHUN LEPAS JUMLAH
today lastweek lastmonth lastyear total

WAKTU PERKHIDMATAN

   Isnin - Khamis  :  8.00 pagi – 5.00 petang
   Jumaat  :  8.00 pagi – 12.15 tengah hari
     2.45 petang - 5.00 petang

   Sabtu, Ahad & Cuti Umum: TUTUP


Paparan terbaik menggunakan Google Chrome dan mozila firefox dengan resolusi 1600 X 900
Hakcipta Terpelihara @2023, Perpustakaan JPS Malaysia
Penafian :Kerajaan Malaysia dan Pihak Jabatan Pengairan dan Saliran Malaysia tidak bertanggungjawab terhadap sebarang kerugian atau kerosakan yang dialami kerana menggunakan maklumat dalam portal ini.

Powered by Koha