KAJIAN PELAN INDUK RANCANGAN TEBATAN BANJIR SUNGAI BARU MELAKA FINAL REPORT Volume II - Flood Mitigation Study July 2022// Jabatan Pengairan dan Saliran Malaysia
Material type: TextLanguage: English Publisher: Kuala Lumpu: Jabatan Pengairan dan Saliran Malaysia 2022Description: 460 pagez : illustrations, charts,colour photpgraphs, maps 30 cmContent type:- text
- unmediated
- volume
Item type | Current library | Collection | Call number | Copy number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|---|
Laporan Kajian | JPS HQ Library Main Library | Red Spot | CS-MA 046 (Browse shelf(Opens below)) | 1 | Available | 1000036805 |
Browsing JPS HQ Library shelves, Shelving location: Main Library, Collection: Red Spot Close shelf browser (Hides shelf browser)
Chapter 1 Introduction--Chapter 2 Description of Study Area--Chapter 3Site and Flooding Conditions--Chapter 4 Data Collection and Managementt--Chapter5 Hydrological Analysis--6 Hydraulic and Hydrodynamic Modelling--Chapter 7 Flood Hazard Assessment -Chapter 8 Flood Damage Assessment--9 Flood Risk Assessment-Chapter10 Flood Evacuation Assessment--Chapter 11 Planning and Design Criteria--Chapter 12 Flood Mitigation Options--Chapter 13 Option Recommendation--Chapter 14 The Flood Mitigation Plan for Sungai Baru
In English
There are no comments on this title.