ENVIRONMENTAL COMPLIANCE AUDIT FOR 'PROJEK MENAIKTARAF EMPANGAN TIMAH TASOH FASA 3: MENAIKTARAF ALUR LIMPAH TIMAH DAN KERJA-KERJA BERKAITAN (PAKEJ 1); PERLIS JUNE 2022// Jabatan Pengairan dan Saliran Malaysia
Material type:
- text
- unmediated
- volume
Item type | Current library | Collection | Call number | Copy number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|---|
Laporan Kajian | JPS HQ Library Main Library | General Collections | CS-PR089 (Browse shelf(Opens below)) | 1 | Available | 1000036598 |
1.0 INTRODUCTION--2.0 AUDIT SITE ADMINISTRATIVE DETAILS--CHAPTER 3.0 REGULATORY COMPLIANCE SUMMARY--4.0 ENVIRONMENTAL COMPLIANCE AUDIT FINDINGS SUMMARY--5.0 ENVIRONMENTAL COMPLANCE AUDIT CHECKLISTS--6.0 ENVIRONMWENTAL SAMPLING RESULTS--7.0 ADDITIONAL NON-COMPLIANCE FOR THE ENVIRONMENTAL SAMPLING RESULTS--8.0 ADDITIONAL NOTATIONS / EXPLANATIONS ON THE AUDIT FINDINGS--9.0 RECOMMENDATIONS FOR NON-COMPLIANCES FOUND
Environmental compliance Audit (ECA) was conducted on 7th June 2022 for the Project titled 'Projek menaiktaraf Empangan Timah Tasoh Fasa 3: Menaiktaraf Alur Limpah Timur dan Kerja-Kerja Berkaitan (Pakej)' in Perlis.
In Malay and English