ENVIRONMENTAL COMPLIANCE AUDIT FOR 'PROJEK MENAIKTARAF EMPANGAN TIMAH TASOH FASA 3: MENAIKTARAF ALUR LIMPAH TIMAH DAN KERJA-KERJA BERKAITAN (PAKEJ 1); PERLIS JUNE 2022// Jabatan Pengairan dan Saliran Malaysia

By: Contributor(s): Material type: TextTextLanguage: English Publisher: Kuala Lumpur : Jabatan pengairan dan Saliran Malaysia, 2022Description: Various pagings : illustrations, colour photographs, colour maps ; 30 cm+ computer optical disc (4 3/4 in.)Content type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
Subject(s):
Contents:
1.0 INTRODUCTION--2.0 AUDIT SITE ADMINISTRATIVE DETAILS--CHAPTER 3.0 REGULATORY COMPLIANCE SUMMARY--4.0 ENVIRONMENTAL COMPLIANCE AUDIT FINDINGS SUMMARY--5.0 ENVIRONMENTAL COMPLANCE AUDIT CHECKLISTS--6.0 ENVIRONMWENTAL SAMPLING RESULTS--7.0 ADDITIONAL NON-COMPLIANCE FOR THE ENVIRONMENTAL SAMPLING RESULTS--8.0 ADDITIONAL NOTATIONS / EXPLANATIONS ON THE AUDIT FINDINGS--9.0 RECOMMENDATIONS FOR NON-COMPLIANCES FOUND
Summary: Environmental compliance Audit (ECA) was conducted on 7th June 2022 for the Project titled 'Projek menaiktaraf Empangan Timah Tasoh Fasa 3: Menaiktaraf Alur Limpah Timur dan Kerja-Kerja Berkaitan (Pakej)' in Perlis.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode
Laporan Kajian JPS HQ Library Main Library General Collections CS-PR089 (Browse shelf(Opens below)) 1 Available 1000036598

1.0 INTRODUCTION--2.0 AUDIT SITE ADMINISTRATIVE DETAILS--CHAPTER 3.0 REGULATORY COMPLIANCE SUMMARY--4.0 ENVIRONMENTAL COMPLIANCE AUDIT FINDINGS SUMMARY--5.0 ENVIRONMENTAL COMPLANCE AUDIT CHECKLISTS--6.0 ENVIRONMWENTAL SAMPLING RESULTS--7.0 ADDITIONAL NON-COMPLIANCE FOR THE ENVIRONMENTAL SAMPLING RESULTS--8.0 ADDITIONAL NOTATIONS / EXPLANATIONS ON THE AUDIT FINDINGS--9.0 RECOMMENDATIONS FOR NON-COMPLIANCES FOUND

Environmental compliance Audit (ECA) was conducted on 7th June 2022 for the Project titled 'Projek menaiktaraf Empangan Timah Tasoh Fasa 3: Menaiktaraf Alur Limpah Timur dan Kerja-Kerja Berkaitan (Pakej)' in Perlis.

In Malay and English

There are no comments on this title.

to post a comment.

HUBUNGI KAMI

Perpustakaan Jabatan Pengairan dan Saliran Malaysia (JPS Malaysia)
Aras Bawah, Blok A, Kompleks Ibu Pejabat JPS Malaysia
Persiaran Rimba Permai, Cyber 8
63000 Cyberjaya, Selangor

No Tel : 03 – 2697 3050

Emel : adminlibrary@water.gov.my

MEDIA SOSIAL


KAUNTER PELAWAT

HARI INI MINGGU LEPAS BULAN LEPAS TAHUN LEPAS JUMLAH
today lastweek lastmonth lastyear total

WAKTU PERKHIDMATAN

   Isnin - Khamis  :  8.00 pagi – 5.00 petang
   Jumaat  :  8.00 pagi – 12.15 tengah hari
     2.45 petang - 5.00 petang

   Sabtu, Ahad & Cuti Umum: TUTUP


Paparan terbaik menggunakan Google Chrome dan mozila firefox dengan resolusi 1600 X 900
Hakcipta Terpelihara @2023, Perpustakaan JPS Malaysia
Penafian :Kerajaan Malaysia dan Pihak Jabatan Pengairan dan Saliran Malaysia tidak bertanggungjawab terhadap sebarang kerugian atau kerosakan yang dialami kerana menggunakan maklumat dalam portal ini.

Powered by Koha