PENYEDIAAN PELAN PENGURUSAN LEMBANGAN SUNGAI BERSEPADU (IRBM) SUNGAI SETIU, TERENGGANU FINAL REPORT (Volume I: Executive Summary/ ringkasan Eksekutif), MAY 2021 // MegaConsult Sdn. Bhd
Material type: TextLanguage: English, Malay Publisher: Kuala Lumpur : Jabatan Pengairan dan Saliran Malaysia, 2021Description: various pagings, colour illustrations, colour maps, colour photographs, charts ; 30 cmContent type:- text
- unmediated
- volume
Item type | Current library | Collection | Call number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|
Laporan Kajian | JPS HQ Library Main Library | General Collections | CS-TR131 (Browse shelf(Opens below)) | Available | 1000036503 | ||
Laporan Kajian | JPS HQ Library Main Library | General Collections | CS-TR131 (Browse shelf(Opens below)) | Available | 1000036472 | ||
Laporan Kajian | JPS HQ Library Main Library | General Collections | CS-TR131 (Browse shelf(Opens below)) | Available | 1000036471 |
1 INTRODUCTION -- 2 PROJECT BACKGROUND -- 3 SCOPE OF WORKS -- 4 PROJECT PLAN -- 5 STUDY AREA -- 6 MAIN ISSUES -- 7 STAKEHOLDERS -- 8 MODELLING -- 9 ENSURE WATER SUFFICIENCY -- 10 ENSURE CLEAN WATER -- 11 REDUCE FLOOD RISK -- 12 ENHACE ENVIRONMENTAL CONSERVATION -- 13 LANDUSE PLANNING -- 14 PUBLIC OUTREACH PROGRAMME -- 15 COST BENEFIT ANALYSIS AND CREATIVITY INDEX -- 16 LEGISLATION AND INSTITUTION -- 17 STATE-OF-THE-RIVER REPORT -- 18 IRBM STRATEGIC ACTION PLAN -- 19 GEOSPATIAL INFORMATION SYSTEM AND GEODATABASE
This study is to produce an IRBM plan to support sustaibable management of the Sungai Setiu River Basin taking into consideration various issues in the river basin in line with the main objectives of IRBM plan towards achieving the ensuring water sufficiency, ensuring clean water, reduction of flooding risks and enhancement of environment conservation.
In English and Malay
There are no comments on this title.