PENYEDIAAN PELAN PENGURUSAN LEMBANGAN SUNGAI BERSEPADU (IRBM) SUNGAI DUNGUN, TERENGGANU FINAL REPORT (Volume III : IRBM Management Plan), July 2021// MegaConsult Sdn.Bhd (MEGA)

By: Contributor(s): Material type: TextTextLanguage: English Publisher: Kuala Lumpur : Jabatan Pengairan dan Saliran Malaysia , 2021Description: various pagings : colour illustration, colour maps ; 30 cmContent type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
Subject(s):
Contents:
The Strategic Action PLan (SAP) consists of 4 main objectives which are ensuring water suffiency, reducing flood risk, ensuring clean water and enhancement of environmental conservation. The development of the SAP was to identify the structural and non-structural measures to achieve the long-term aims of the IRBM study. The SAP one of the main tasks for the IRBM study which aims to formulate holistic strategies and action plan which is land use, legislation and Public Outreach Program (POP). The link of the SAP and CI and CBA is also analysed and presented. The Strategic Action Plan (SAP) report has been prepared specifically to provide details on identified isssues, strategic 'objectives', the identified actipn plans, costingg, time-frame, KPIs and key stakeholders and link to landuse.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode
Laporan Kajian JPS HQ Library Main Library General Collections CS-TR130 (Browse shelf(Opens below)) Available 1000036453
Laporan Kajian JPS HQ Library Main Library General Collections CS-TR130 (Browse shelf(Opens below)) Available 1000036459
Laporan Kajian JPS HQ Library Main Library General Collections CS-TR130 (Browse shelf(Opens below)) Available 1000036460

1 INTRODUCTION -- 2 APPROACH AND METHODOLOGY -- 3 FRAMEWORK -- 4 STRATEGIC ACTION PLAN -- 5 CONCLUSIONS

The Strategic Action PLan (SAP) consists of 4 main objectives which are ensuring water suffiency, reducing flood risk, ensuring clean water and enhancement of environmental conservation. The development of the SAP was to identify the structural and non-structural measures to achieve the long-term aims of the IRBM study. The SAP one of the main tasks for the IRBM study which aims to formulate holistic strategies and action plan which is land use, legislation and Public Outreach Program (POP). The link of the SAP and CI and CBA is also analysed and presented. The Strategic Action Plan (SAP) report has been prepared specifically to provide details on identified isssues, strategic 'objectives', the identified actipn plans, costingg, time-frame, KPIs and key stakeholders and link to landuse.

In English

There are no comments on this title.

to post a comment.

HUBUNGI KAMI

Perpustakaan Jabatan Pengairan dan Saliran Malaysia (JPS Malaysia)
Aras Bawah, Blok A, Kompleks Ibu Pejabat JPS Malaysia
Persiaran Rimba Permai, Cyber 8
63000 Cyberjaya, Selangor

No Tel : 03 – 2697 3050

Emel : adminlibrary@water.gov.my

MEDIA SOSIAL


KAUNTER PELAWAT

HARI INI MINGGU LEPAS BULAN LEPAS TAHUN LEPAS JUMLAH
today lastweek lastmonth lastyear total

WAKTU PERKHIDMATAN

   Isnin - Khamis  :  8.00 pagi – 5.00 petang
   Jumaat  :  8.00 pagi – 12.15 tengah hari
     2.45 petang - 5.00 petang

   Sabtu, Ahad & Cuti Umum: TUTUP


Paparan terbaik menggunakan Google Chrome dan mozila firefox dengan resolusi 1600 X 900
Hakcipta Terpelihara @2023, Perpustakaan JPS Malaysia
Penafian :Kerajaan Malaysia dan Pihak Jabatan Pengairan dan Saliran Malaysia tidak bertanggungjawab terhadap sebarang kerugian atau kerosakan yang dialami kerana menggunakan maklumat dalam portal ini.

Powered by Koha