Masterplan Study on Flood Mitigation for Sungai Bentong Basin, Pahang Darul Makmur - Volume III, Main Report-Priliminary Design of Facilities, Integrated Development Plan and Investment Plan

By: Material type: TextTextPublication details: Selangor: SSI Consulting Engineers Sdn. Bhd., 2002Description: Various paging, illust, 29cmSubject(s):
Contents:
7.0 PRELIMINARY DESIGN OF REGIONAL STORAGE FACILITIES: 7.1 General. 7.2 Sizing Outlet Facilities. 7.3 Upper Bentong Storage Facility. 7.3.1 Proposed Layout of Dam and Related Works. 7.3.2 Embankment. 7.3.3 Primary Outlet/Riser. 7.3.4 Secondary Outlet/Emergency Spillway. 7.3.5 River Diversion Arrangement. 7.4 Sempeli Storage Facility. 7.4.1 Proposed Layout of Dam and Related Works. 7.4.2 Enbankment. 7.4.3 Primary Outlet/Intake Tower. 7.4.4 Secondary Outlet/Emergency Spillway. 7.4.5 River Diversion Arrangement 7.4.6 Access Road to Damsite. 7.5 Penjuring-Sempeli Transfer System. 7.6 Retrofitting of Existing Old Repas Dam. 7.7 Chamang Storage Facility. 7.7.1 Embankment.7.7.2 Primary Outlet/Riser. 7.7.3 Secongary Outlet/Spillway. 7.8 Retrotting of Existing Perting Dam. 7.8.1 Fitted Primary Outlet/Riser. 7.8.2 Raised Secondary Outlet/Spillway. 8.0 Town River Rehabilitation and Upgrading Plan. 8.1 Inttroduction. 8.2 Riverland Reserve Uses and Recovery Plan. 8.2.1 River Width Partitioning and Limit. 8.2.2 Existing Delopment and Utilities. 8.3 Landscape Inventory and Analysis. 8.3.1 Existing Vegetation. 8.3.2 Visual Quality. 8.3.3 Audio Quality. 8.3.4 River SlopeFrendliness and Open Space. 8.4 River Master Plam Proposals. 8.5 Proposed River Section and Protection Works. 8.6 Drain Outfall Structures. 8.7 Landscape, Park and Recreational Features. 9.0 Prliminary Town Stormwater Masterplan. 9.1 General. 9.2 Draft Bentong Town Local Plan 2010. 9.3 Stormwater Management Solution. 9.3.1 Stormwater Management Alternatives. 9.3.2 Solving Localised Floods 9.3.3 Solving Sediment and Floatable Problems. 9.4 Formulation of Stormwater Masterplan. 9.4.1 Siting Strategies. 9.4.2 Tasks. 9.4.3 Surface Soil and Groundwater Level Surveys. 9.4.4 Identified Stormwater System Layout. 9.5 Recommended Plans. 9.5.1 Community Ponds. 9.5.2 Conveyance. 9.5.3 Infiltration Related Facilities. 9.5.4 XCoarse Sediment and Floatable Traps. 10.0 Integrated Development of Sempeli Reservoir. 10.1 General. 10.2 Water Supply. 10.2.1 Existing System. 10.2.2 Planned Expension for Bentong District. 10.2.3 Present Proposal for Bentong Town. 10.3 Recreation and Tourism. 10.3.1 Existing Sites in Bentong District. 10.3.2 Sempeli Reservoir Site. 10.3.3 Tourist Arrival in Pahang. 10.4 Freshwater Aquaculture. 10.5 General Socio-economy Benefits. 11.0 Coast Estimate and Investment Plan. 11.1 General. 11.2 Cost Estimate. 11.3 Implementation Schedule. 11.4 Estimated Project Costs. 11.5 Investment Plan. 11.6 Implementation Activities and Construction. 11.6.1 Detailed Design and Pre Construction Activities. 11.6.2 Construction. 12.0 Socio-economic Aspect and Benefit. 12.1 General. 12.2 Population. 12.3 Economy. 12.4 General Development of the District. 12.5 The Impact of Flood Mitigation Project. 12.6 Summary
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode
Laporan Kajian JPS HQ Library Main Library General Collections CS-PH154 (Browse shelf(Opens below)) Checked out 01/07/2009 1000026396
Laporan Kajian JPS HQ Library Main Library Red Spot CS-PH154 (Browse shelf(Opens below)) Available 1000026397

7.0 PRELIMINARY DESIGN OF REGIONAL STORAGE FACILITIES: 7.1 General. 7.2 Sizing Outlet Facilities. 7.3 Upper Bentong Storage Facility. 7.3.1 Proposed Layout of Dam and Related Works. 7.3.2 Embankment. 7.3.3 Primary Outlet/Riser. 7.3.4 Secondary Outlet/Emergency Spillway. 7.3.5 River Diversion Arrangement. 7.4 Sempeli Storage Facility. 7.4.1 Proposed Layout of Dam and Related Works. 7.4.2 Enbankment. 7.4.3 Primary Outlet/Intake Tower. 7.4.4 Secondary Outlet/Emergency Spillway. 7.4.5 River Diversion Arrangement 7.4.6 Access Road to Damsite. 7.5 Penjuring-Sempeli Transfer System. 7.6 Retrofitting of Existing Old Repas Dam. 7.7 Chamang Storage Facility. 7.7.1 Embankment.7.7.2 Primary Outlet/Riser. 7.7.3 Secongary Outlet/Spillway. 7.8 Retrotting of Existing Perting Dam. 7.8.1 Fitted Primary Outlet/Riser. 7.8.2 Raised Secondary Outlet/Spillway. 8.0 Town River Rehabilitation and Upgrading Plan. 8.1 Inttroduction. 8.2 Riverland Reserve Uses and Recovery Plan. 8.2.1 River Width Partitioning and Limit. 8.2.2 Existing Delopment and Utilities. 8.3 Landscape Inventory and Analysis. 8.3.1 Existing Vegetation. 8.3.2 Visual Quality. 8.3.3 Audio Quality. 8.3.4 River SlopeFrendliness and Open Space. 8.4 River Master Plam Proposals. 8.5 Proposed River Section and Protection Works. 8.6 Drain Outfall Structures. 8.7 Landscape, Park and Recreational Features. 9.0 Prliminary Town Stormwater Masterplan. 9.1 General. 9.2 Draft Bentong Town Local Plan 2010. 9.3 Stormwater Management Solution. 9.3.1 Stormwater Management Alternatives. 9.3.2 Solving Localised Floods 9.3.3 Solving Sediment and Floatable Problems. 9.4 Formulation of Stormwater Masterplan. 9.4.1 Siting Strategies. 9.4.2 Tasks. 9.4.3 Surface Soil and Groundwater Level Surveys. 9.4.4 Identified Stormwater System Layout. 9.5 Recommended Plans. 9.5.1 Community Ponds. 9.5.2 Conveyance. 9.5.3 Infiltration Related Facilities. 9.5.4 XCoarse Sediment and Floatable Traps. 10.0 Integrated Development of Sempeli Reservoir. 10.1 General. 10.2 Water Supply. 10.2.1 Existing System. 10.2.2 Planned Expension for Bentong District. 10.2.3 Present Proposal for Bentong Town. 10.3 Recreation and Tourism. 10.3.1 Existing Sites in Bentong District. 10.3.2 Sempeli Reservoir Site. 10.3.3 Tourist Arrival in Pahang. 10.4 Freshwater Aquaculture. 10.5 General Socio-economy Benefits. 11.0 Coast Estimate and Investment Plan. 11.1 General. 11.2 Cost Estimate. 11.3 Implementation Schedule. 11.4 Estimated Project Costs. 11.5 Investment Plan. 11.6 Implementation Activities and Construction. 11.6.1 Detailed Design and Pre Construction Activities. 11.6.2 Construction. 12.0 Socio-economic Aspect and Benefit. 12.1 General. 12.2 Population. 12.3 Economy. 12.4 General Development of the District. 12.5 The Impact of Flood Mitigation Project. 12.6 Summary

eng

There are no comments on this title.

to post a comment.

HUBUNGI KAMI

Perpustakaan Jabatan Pengairan dan Saliran Malaysia (JPS Malaysia)
Aras Bawah, Blok A, Kompleks Ibu Pejabat JPS Malaysia
Persiaran Rimba Permai, Cyber 8
63000 Cyberjaya, Selangor

No Tel : 03 – 2697 3050

Emel : adminlibrary@water.gov.my

MEDIA SOSIAL


KAUNTER PELAWAT

HARI INI MINGGU LEPAS BULAN LEPAS TAHUN LEPAS JUMLAH
today lastweek lastmonth lastyear total

WAKTU PERKHIDMATAN

   Isnin - Khamis  :  8.00 pagi – 5.00 petang
   Jumaat  :  8.00 pagi – 12.15 tengah hari
     2.45 petang - 5.00 petang

   Sabtu, Ahad & Cuti Umum: TUTUP


Paparan terbaik menggunakan Google Chrome dan mozila firefox dengan resolusi 1600 X 900
Hakcipta Terpelihara @2023, Perpustakaan JPS Malaysia
Penafian :Kerajaan Malaysia dan Pihak Jabatan Pengairan dan Saliran Malaysia tidak bertanggungjawab terhadap sebarang kerugian atau kerosakan yang dialami kerana menggunakan maklumat dalam portal ini.

Powered by Koha