Investigation and Assessment of Municipal Landfill Sites in the Federal Territory of Kuala Lumpur - Executive Summary

By: Contributor(s): Material type: TextTextPublication details: Kuala Lumpur; DOE 1999Description: Various paging,illust,29cmSubject(s):
Contents:
1.0. Introduction. 2.0. Aims and Objectives of the Study. 3.0. Results of the Study on Landfill Sites (Phase 1): 3.1. Characteristics of the Landfill Sites. 3.2. Surrounding Landuse. 3.3. Social Aspects. 3.4. Topography. 3.5. Constructions of Boreholes and Monitoring Wells. 3.6. Geological and Hydrogeological Studies. 3.7. Local Groundwater Pattern. 3.8. Hydrological Aspects Including Local Surface Water Bodies. 3.9. Water Quality. 3.10. Assessment of Landfill Sites Based on Pollutants Distribution in Soils, Groundwater Samples from the Landfill Sites. 3.11. Gas Measurement. 3.12. Vegetation Studies. 3.13. Fauna Diversity and Toxicity Tests. 3.14. Identification of the Overall Most Critical Site. 3.15. Identification of the Most Polluted Site. 4.0. Detailed Investigation and Assessment of Taman Beringin Landfill Site (Phase2) 5.0. Results of Detailed Investigation of Taman Beringin Landfill Site (Phase2): 5.1. Landuse. 5.2. Social Aspects. 5.3. Topography. 5.4. Characteristics of Boreholes and Monitoring Wells and Measurement of Settlement. 5.5. Geological and Hydrogeological Impacts. 5.6. Groundwater flow Pattern. 5.7. Surface Hydrology. 5.8. Surface Water Quality. 5.9. Gas Emissions. 5.10. Vegetation Studies. 5.11. Faunal Diversity. 5.12. Toxicity of Surface Leachate from Taman Beringin Landfill to Aquatic Organisms. 5.13. Chemical Analysis of Organic and Inorganic Pollutants in Groundwater/Leachate and Soil Sample. 6.0. Risk Assessment of Taman Beringin Landfill Side: 6.1. Risk Assessment on Taman Beringin Landfill Site Based on Contaminants of Potential Concern Detected in Surface and Subsurface Soil, Surface Waters and Groundwater/Leachate. 7.0. Rehabilitation Plans for Taman Beringin Landfill Site: 7.1. Problems at Taman Beringin Landfill Site. 7.2. Short Term Rehabilitation Measures. 7.3. Medium Term Rehabilitation Measures. 7.4. Medium to Long Term Rehabilitation Measures. 8.0. Proposed Criteria for Closure of Landfill Site and Redevelopment: 8.1. Proposed Guidelines for Closure of Landfill Site. 8.2. Criteria for Redevelopment. 9.0. Conclusion.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)

1.0. Introduction. 2.0. Aims and Objectives of the Study. 3.0. Results of the Study on Landfill Sites (Phase 1): 3.1. Characteristics of the Landfill Sites. 3.2. Surrounding Landuse. 3.3. Social Aspects. 3.4. Topography. 3.5. Constructions of Boreholes and Monitoring Wells. 3.6. Geological and Hydrogeological Studies. 3.7. Local Groundwater Pattern. 3.8. Hydrological Aspects Including Local Surface Water Bodies. 3.9. Water Quality. 3.10. Assessment of Landfill Sites Based on Pollutants Distribution in Soils, Groundwater Samples from the Landfill Sites. 3.11. Gas Measurement. 3.12. Vegetation Studies. 3.13. Fauna Diversity and Toxicity Tests. 3.14. Identification of the Overall Most Critical Site. 3.15. Identification of the Most Polluted Site. 4.0. Detailed Investigation and Assessment of Taman Beringin Landfill Site (Phase2) 5.0. Results of Detailed Investigation of Taman Beringin Landfill Site (Phase2): 5.1. Landuse. 5.2. Social Aspects. 5.3. Topography. 5.4. Characteristics of Boreholes and Monitoring Wells and Measurement of Settlement. 5.5. Geological and Hydrogeological Impacts. 5.6. Groundwater flow Pattern. 5.7. Surface Hydrology. 5.8. Surface Water Quality. 5.9. Gas Emissions. 5.10. Vegetation Studies. 5.11. Faunal Diversity. 5.12. Toxicity of Surface Leachate from Taman Beringin Landfill to Aquatic Organisms. 5.13. Chemical Analysis of Organic and Inorganic Pollutants in Groundwater/Leachate and Soil Sample. 6.0. Risk Assessment of Taman Beringin Landfill Side: 6.1. Risk Assessment on Taman Beringin Landfill Site Based on Contaminants of Potential Concern Detected in Surface and Subsurface Soil, Surface Waters and Groundwater/Leachate. 7.0. Rehabilitation Plans for Taman Beringin Landfill Site: 7.1. Problems at Taman Beringin Landfill Site. 7.2. Short Term Rehabilitation Measures. 7.3. Medium Term Rehabilitation Measures. 7.4. Medium to Long Term Rehabilitation Measures. 8.0. Proposed Criteria for Closure of Landfill Site and Redevelopment: 8.1. Proposed Guidelines for Closure of Landfill Site. 8.2. Criteria for Redevelopment. 9.0. Conclusion.

eng

There are no comments on this title.

to post a comment.

HUBUNGI KAMI

Perpustakaan Jabatan Pengairan dan Saliran Malaysia (JPS Malaysia)
Aras Bawah, Blok A, Kompleks Ibu Pejabat JPS Malaysia
Persiaran Rimba Permai, Cyber 8
63000 Cyberjaya, Selangor

No Tel : 03 – 2697 3050

Emel : adminlibrary@water.gov.my

MEDIA SOSIAL


KAUNTER PELAWAT

HARI INI MINGGU LEPAS BULAN LEPAS TAHUN LEPAS JUMLAH
today lastweek lastmonth lastyear total

WAKTU PERKHIDMATAN

   Isnin - Khamis  :  8.00 pagi – 5.00 petang
   Jumaat  :  8.00 pagi – 12.15 tengah hari
     2.45 petang - 5.00 petang

   Sabtu, Ahad & Cuti Umum: TUTUP


Paparan terbaik menggunakan Google Chrome dan mozila firefox dengan resolusi 1600 X 900
Hakcipta Terpelihara @2023, Perpustakaan JPS Malaysia
Penafian :Kerajaan Malaysia dan Pihak Jabatan Pengairan dan Saliran Malaysia tidak bertanggungjawab terhadap sebarang kerugian atau kerosakan yang dialami kerana menggunakan maklumat dalam portal ini.

Powered by Koha