Feasibility Study and Detailed Design of Coastal Protection Works at Dungun (Terengganu) from Miri to Kuala Baram (Sarawak) from Tinagat to Batu Payong and Tungku (Sabah): Final Report, Volume 2

By: Contributor(s): Material type: TextTextPublication details: Ranhill Bersekutu Sdn. Bhd. 1991Description: pSubject(s):
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode
Laporan Kajian JPS HQ Library Main Library General Collections CS-TR112 (Browse shelf(Opens below)) 1 Available 1000009414
Browsing JPS HQ Library shelves, Shelving location: Main Library, Collection: General Collections Close shelf browser (Hides shelf browser)
No cover image available No cover image available No cover image available No cover image available No cover image available
CS-TR110 Feasibility Study and Detailed Design of Coastal Protection Works at Dungun (Terengganu) from Miri to Kuala Baram (Sarawak) from Tinagat to Batu Payong and Tungku (Sabah): Detailed Design Report, Volume 1 - Construction of Headlands, Revetment and Beach Nourishment at Dungun, Terengganu CS-TR111 Feasibility Study and Detailed Design of Coastal Protection Works at Dungun (Terengganu) from Miri to Kuala Baram (Sarawak) from Tinagat to Batu Payong and Tungku (Sabah): Detailed Design Report, Volume 2 - Construction and Completion of Rubble Mound Revetments for Coastal Protection at Miri, Sarawak CS-TR111 Feasibility Study and Detailed Design of Coastal Protection Works at Dungun (Terengganu) from Miri to Kuala Baram (Sarawak) from Tinagat to Batu Payong and Tungku (Sabah): Detailed Design Report, Volume 2 - Construction and Completion of Rubble Mound Revetments for Coastal Protection at Miri, Sarawak CS-TR112 Feasibility Study and Detailed Design of Coastal Protection Works at Dungun (Terengganu) from Miri to Kuala Baram (Sarawak) from Tinagat to Batu Payong and Tungku (Sabah): Final Report, Volume 2 CS-TR113 628.21 (595.10) SYE Preliminary engineering design for sewerage & sewage treatment in Kuala Trengganu: Preliminary engineering drawings CS-TR114 Review of Besut Flood Mitigation Project and Detailed Design of Besut Barrage, Phase 1 Review, Final Report, Volume I - Executive Summary & Engineering Studies, March 2002 CS-TR114 Review of Besut Flood Mitigation Project and Detailed Design of Besut Barrage, Phase 1 Review, Final Report, Volume I - Executive Summary & Engineering Studies, March 2002

There are no comments on this title.

to post a comment.

HUBUNGI KAMI

Perpustakaan Jabatan Pengairan dan Saliran Malaysia (JPS Malaysia)
Aras Bawah, Blok A, Kompleks Ibu Pejabat JPS Malaysia
Persiaran Rimba Permai, Cyber 8
63000 Cyberjaya, Selangor

No Tel : 03 – 2697 3050

Emel : adminlibrary@water.gov.my

MEDIA SOSIAL


KAUNTER PELAWAT

HARI INI MINGGU LEPAS BULAN LEPAS TAHUN LEPAS JUMLAH
today lastweek lastmonth lastyear total

WAKTU PERKHIDMATAN

   Isnin - Khamis  :  8.00 pagi – 5.00 petang
   Jumaat  :  8.00 pagi – 12.15 tengah hari
     2.45 petang - 5.00 petang

   Sabtu, Ahad & Cuti Umum: TUTUP


Paparan terbaik menggunakan Google Chrome dan mozila firefox dengan resolusi 1600 X 900
Hakcipta Terpelihara @2023, Perpustakaan JPS Malaysia
Penafian :Kerajaan Malaysia dan Pihak Jabatan Pengairan dan Saliran Malaysia tidak bertanggungjawab terhadap sebarang kerugian atau kerosakan yang dialami kerana menggunakan maklumat dalam portal ini.

Powered by Koha