KAJIAN PELAN INDUK RANCANGAN TEBATAN BANJIR SUNGAI PETANI, KEDAH Final Report Volume 1- Executive Summary May 2022 //
KAJIAN PELAN INDUK RANCANGAN TEBATAN BANJIR SUNGAI PETANI, KEDAH Final Report Volume 1- Executive Summary May 2022 //
TBS Consulting Engineer
- Various pagings : illustrations, charts,colour photpgraphs, maps 30 cm
1.0 Study Background--2.0 Objective of the Study--3.0 Scope of Services--4.0 Study Approach--5.0 Hydraulic Analysis --6.0 Hydraulic Analysiis and Modelling -7.0 Flood Mapping--8.0 Flood Mitigation Options and Recommendations--9.0 Flood Mitigation Master Plan for Sungai Petani--10.0 Flood Mitigation Measures with 50-Years ARI--11.0 Flood Mitigation Measures For 100-Years ARI--12.0 Short-Term Plan--13.0 Description of Proposed Flood Mitigation Measures--14.0 Comparison of Dessign Discharge
In English
1.0 Study Background--2.0 Objective of the Study--3.0 Scope of Services--4.0 Study Approach--5.0 Hydraulic Analysis --6.0 Hydraulic Analysiis and Modelling -7.0 Flood Mapping--8.0 Flood Mitigation Options and Recommendations--9.0 Flood Mitigation Master Plan for Sungai Petani--10.0 Flood Mitigation Measures with 50-Years ARI--11.0 Flood Mitigation Measures For 100-Years ARI--12.0 Short-Term Plan--13.0 Description of Proposed Flood Mitigation Measures--14.0 Comparison of Dessign Discharge
In English