Your search returned 21 results.

Sort
Results
1.
Anglo Japanese Airport Consortium & KL International Airport Masterplan Study-Techical Note D3-Implications of The Drainage Diversion Channel by
Material type: Text Text; Format: print ; Literary form: Not fiction
Publication details: HSS Integrated Sdn. Bhd. 1992
Availability: Items available for loan: JPS HQ Library (1)Call number: D-0155.

2.
Anglo Japanese Airport Consortium & KL International Airport Masterplan Study-The Note D1-hydrology & Drainage by
Material type: Text Text; Format: print ; Literary form: Not fiction
Publication details: HSS Integrated Sdn. Bhd. 1992
Availability: Items available for loan: JPS HQ Library (1)Call number: D-0154.

3.
Lemal Area And Rantau Panjang Flood Protection Scheme Kelantan Darul Naim: Final Report, Vol. VIII - Economic Analysis, June 1995 by
Material type: Text Text; Format: print ; Literary form: Not fiction
Language: English
Publication details: [Kuala Lumpur]: HSS Integrated Sdn. Bhd., 1995
Availability: Items available for loan: JPS HQ Library (2)Call number: CS-KN217, ...

4.
Lemal Area And Rantau Panjang Flood Protection Scheme Kelantan Darul Naim: Final Report, Vol. VII- Resettlement Planning, October 1995 by
Material type: Text Text; Format: print ; Literary form: Not fiction
Publication details: HSS Integrated Sdn. Bhd. 1995
Availability: Items available for loan: JPS HQ Library (3)Call number: CS-KN216, ...

5.
Lemal Area And Rantau Panjang Flood Protection Scheme Kelantan Darul Naim: Final Report, Vol. IV - Agriculture Development Plan, April 1995 by
Material type: Text Text; Format: print ; Literary form: Not fiction
Publication details: HSS Integrated Sdn. Bhd. 1995
Availability: Items available for loan: JPS HQ Library (2)Call number: CS-KN215, ...

6.
Lemal Area And Rantau Panjang Flood Protection Scheme Kelantan Darul Naim: Final Report, Vol. III - Water Resources And Infrastructure, May 1995 by
Material type: Text Text; Format: print ; Literary form: Not fiction
Publication details: HSS Integrated Sdn. Bhd. 1995
Availability: Items available for loan: JPS HQ Library (2)Call number: CS-KN214, ...

7.
Lemal Area And Rantau Panjang Flood Protection Scheme Kelantan Darul Naim: Final Report, Vol. II- Engineering, March 1995 by
Material type: Text Text; Format: print ; Literary form: Not fiction
Language: English
Publication details: [Kuala Lumpur]: HSS Integrated Sdn. Bhd., 1995
Availability: Items available for loan: JPS HQ Library (2)Call number: CS-KN213, ...

8.
Lemal Area And Rantau Panjang Flood Protection Scheme Kelantan Darul Naim: Final Report, Vol. I - Mathematical Modelling, April 1995 by
Material type: Text Text; Format: print ; Literary form: Not fiction
Publication details: HSS Integrated Sdn. Bhd. 1995
Availability: Items available for loan: JPS HQ Library (2)Call number: CS-KN212, ...

9.
Kinta River Flood Mitigation and Catchment Area Rehabilitation: Final Report, Volume 5 - ARC/INFO Maps by
Material type: Text Text; Format: print ; Literary form: Not fiction
Language: English
Publication details: Kuala Lumpur: HSS Integrated Sdn. Bhd., 1994
Availability: Items available for loan: JPS HQ Library (2)Call number: CS-PK083, ...

10.
Kinta River Flood Mitigation And Catchment Area Rehabilitation Project: Final Report, Volume 4 - Environmental Evaluation by
Material type: Text Text; Format: print ; Literary form: Not fiction
Publication details: HSS Integrated Sdn. Bhd. 1994
Availability: Items available for loan: JPS HQ Library (2)Call number: CS-PK082, ...

11.
Kinta River Flood Mitigation and Catchment Area Rehabilitation Project: Final Report, Volume 3C - Sungai Kinta Bund Condition Survey Annex III Of Vol. 3B (APP.L) by
Material type: Text Text; Format: print ; Literary form: Not fiction
Publication details: HSS Integrated Sdn. Bhd. 1994
Availability: Items available for loan: JPS HQ Library (2)Call number: CS-PK081, ...

12.
Kinta River Flood Mitigation And Catchment Area Rehabilitation Project: Final Report, Volume 3B - Technical Appendices by
Material type: Text Text; Format: print ; Literary form: Not fiction
Publication details: HSS Integrated Sdn. Bhd. 1994
Availability: Items available for loan: JPS HQ Library (2)Call number: CS-PK080, ...

13.
Kinta River Flood Mitigation And Catchment Area Rehabilitation Project: Final Report, Volume 3A - Technical Appendices by
Material type: Text Text; Format: print ; Literary form: Not fiction
Publication details: HSS Integrated Sdn. Bhd. 1994
Availability: Items available for loan: JPS HQ Library (2)Call number: CS-PK079, ...

14.
Kinta River Flood Mitigation And Catchment Area Rehabilitation Project: Final Report, Volume 2 - Pilot Project by
Material type: Text Text; Format: print ; Literary form: Not fiction
Publication details: HSS Integrated Sdn, Bhd. 1994
Availability: Items available for loan: JPS HQ Library (2)Call number: CS-PK078, ...

15.
Kinta River Flood Mitigation And Catchment Area Rehabilitation Project: Final Report, Volume 1 - Main Report by
Material type: Text Text; Format: print ; Literary form: Not fiction
Publication details: HSS Integrated Sdn. Bhd. 1994
Availability: Items available for loan: JPS HQ Library (2)Call number: CS-PK077, ...

16.
Menawarkan Khidmat Pakarunding Ikhtisas Bagi Projek Pembinaan Empangan/Pemasangan Paip Bawah Tanah Bagi Kegunaan Minuman Di Kedah D.A. - P'TARAN MINAT by
Material type: Text Text; Format: print ; Literary form: Not fiction
Language: Malay
Publication details: HSS Integrated Sdn. Bhd. 1994
Availability: Items available for loan: JPS HQ Library (1)Call number: GA-0862.

17.
Anglo Japanese Airport Consortium & KL International Airport Masterplan Study - Technical Note D2 Hydrology & Drainage by
Material type: Text Text; Format: print ; Literary form: Not fiction
Language: English
Publication details: [Place of publication is not identifed] : HSS Integrated Sdn. Bhd, 1992
Availability: Items available for loan: JPS HQ Library (1)Call number: D-0153.

18.
Reka bentuk terperinci Projek Rancangan Tebatan Banjir bagi Lembangan Sungai Muar (Fasa 1), Johor : Masterplan Report Volume I-Main Report December 2010 by
Material type: Text Text; Format: print ; Literary form: Not fiction
Publication details: Kuala Lumpur : HSS Integrated Sdn Bhd, 2010
Availability: Items available for loan: JPS HQ Library (6)Call number: CS-JR120, ...

19.
MALAYSIA EAST COAST RAILWAY LINK PROJECT PRELIMINARY DESIGNSECTION I CH0+000 ~ CH213+500 : PRELIMINARY DESIGN DRAWINGS OF DRAINAGE AND CULVERT (KELANTAN)/ HSS Integrated by
Material type: Text Text; Format: print ; Literary form: Not fiction
Language: English Publisher: [place of publication not identified]: [publisher not identified], [date of publication not identified]
Availability: Items available for loan: JPS HQ Library (1)Call number: CE 625.123 HSS.

20.
MALAYSIA EAST COAST RAILWAY LINK PROJECT PRELIMINARY DESIGN CH0+000 ~ CH27+462 : PRELIMINARY DESIGN DRAWINGS OF DRAINAGE AND CULVERT BUKIT BESI SPURLINE/ HSS Integrated by
Material type: Text Text; Format: print ; Literary form: Not fiction
Language: English Publisher: [place of publication not identified]: [publisher not identified], [date of publication not identified]
Availability: Items available for loan: JPS HQ Library (1)Call number: CE 625.123 HSS.

Pages

HUBUNGI KAMI

Perpustakaan Jabatan Pengairan dan Saliran Malaysia (JPS Malaysia)
Aras Bawah, Blok A, Kompleks Ibu Pejabat JPS Malaysia
Persiaran Rimba Permai, Cyber 8
63000 Cyberjaya, Selangor

No Tel : 03 – 2697 3050

Emel : adminlibrary@water.gov.my

MEDIA SOSIAL


KAUNTER PELAWAT

HARI INI MINGGU LEPAS BULAN LEPAS TAHUN LEPAS JUMLAH
today lastweek lastmonth lastyear total

WAKTU PERKHIDMATAN

   Isnin - Khamis  :  8.00 pagi – 5.00 petang
   Jumaat  :  8.00 pagi – 12.15 tengah hari
     2.45 petang - 5.00 petang

   Sabtu, Ahad & Cuti Umum: TUTUP


Paparan terbaik menggunakan Google Chrome dan mozila firefox dengan resolusi 1600 X 900
Hakcipta Terpelihara @2023, Perpustakaan JPS Malaysia
Penafian :Kerajaan Malaysia dan Pihak Jabatan Pengairan dan Saliran Malaysia tidak bertanggungjawab terhadap sebarang kerugian atau kerosakan yang dialami kerana menggunakan maklumat dalam portal ini.

Powered by Koha