Technical Notes on On-Farm Water Management (Record no. 8672)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02166nam a2200217#a 4500 |
001 - CONTROL NUMBER | |
control field | vtls000012098 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 230822s1985 xx 000 0 eng d |
040 ## - CATALOGING SOURCE | |
Original cataloging agency | JPS |
090 00 - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) | |
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) | I-0460 |
003 - CONTROL NUMBER IDENTIFIER | |
control field | JPS |
110 ## - MAIN ENTRY--CORPORATE NAME | |
Corporate name or jurisdiction name as entry element | DID. |
245 #0 - TITLE STATEMENT | |
Title | Technical Notes on On-Farm Water Management |
260 ## - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE | |
Place of production, publication, distribution, manufacture | DID |
Date of production, publication, distribution, manufacture | 1985 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | 1. Basic knowledge for on-Farm water management. 1.1 Introduction. 1.2 Concept of on-farm water management. 1.3 Irrigation roles in rice cultivation. 1.4 Water balance. 1.5 Water requirements. 1.5.1 Presaturation. 1.5.2 Normal growth period. 1.6 Rotational irrigation. 2. Planning, design and construction of pilot farms. 2.1 Introduction. 2.2 Planning concept. 2.2.1 different methods of on-farm development. 2.2.2 Size of field block. 2.2.3 Provision of on-farm canals. 2.2.4 Provision of farm road. 2.3. Layout planning of on-farm facilities. 2.3.1 General. 2.3.2. Premilinary survey and study. 2.3.3 Layout of field canals. 2.3.4 Review of layout planning 2.3.5 Surveying. 2.4. Design of on-farm facilities. 2.4.1 Design water discharges. 2.4.2 Hydraulic design conditions. 2.4.3 Design of on-farm facilities. 2.5 Construction. 2.5.1 Procedures of construction work. 2.5.2 Construction supervision. 2.5.3 Land levelling in pilot farm no.3. 3. Water management trial. 3.1 Water management criteria. 3.1.1 Necessity of criteria. 3.1.2 Proposed criteria. 3.1.3 Target of water management trial. 3.2 Routine work of water management trial. 3.2.1 Proposed procedures. 3.2.2 Prerequisite conditions of water management trial. 3.2.3 Required frequency of the water management trial. 3.3 Water management trial in each pilot farm. 3.3.1 Pilot farm no.1. 3.3.2 Pilot farm no.2. 3.3.3 Pilot farm no.3. 4. Maintenance of pilot farms. 4.1 General. 4.2 Inspection patrol. 4.3 Maintenance work. 4.3.1 Regular work. 4.3.2 Emergency work. 4.4 Maintenance of Batas. 4.4.1 Roles of batas and inlet/ outlet. 4.4.2 Fixed route of water flow. 4.4.3 Maintenance of batas. 4.4.4 Maintenance of inlets/outlets. |
650 10 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | IRRIGATION. |
650 20 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | IRRIG. |
650 20 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | WATER MANAGEMENT. |
651 ## - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME | |
Geographic name | MALAYSIA. |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Koha item type | Monograf |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection | Home library | Current library | Shelving location | Date acquired | Total checkouts | Full call number | Barcode | Date last seen | Copy number | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General Collections | JPS HQ Library | JPS HQ Library | Main Library | 22/08/2023 | I-0460 | 1000014506 | 22/08/2023 | 1 | 22/08/2023 | Monograf | |||||
General Collections | JPS HQ Library | JPS HQ Library | Main Library | 22/08/2023 | I-0460 | 1000014521 | 22/08/2023 | 1 | 22/08/2023 | Monograf | |||||
General Collections | JPS HQ Library | JPS HQ Library | Main Library | 22/08/2023 | I-0460 | 1000014527 | 22/08/2023 | 1 | 22/08/2023 | Monograf |