Environmental Impact Assessment Guidelines For Industrial Projects-EG11/95 (Record no. 6342)

MARC details
000 -LEADER
fixed length control field 02294nam a2200229#a 4500
001 - CONTROL NUMBER
control field vtls000008597
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 230822s1995 xx 000 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency JPS
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title eng
043 ## - GEOGRAPHIC AREA CODE
Geographic area code a-my--
090 00 - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) WR-0998
003 - CONTROL NUMBER IDENTIFIER
control field JPS
110 ## - MAIN ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Malaysia.
Subordinate unit Department of Environment
245 #0 - TITLE STATEMENT
Title Environmental Impact Assessment Guidelines For Industrial Projects-EG11/95
260 ## - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture [place of publication not identified]:
Name of producer, publisher, distributor, manufacture Department Of Environment,
Date of production, publication, distribution, manufacture 1995
300 ## - PHYSICAL DESCRIPTION
Extent various pagings
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note 1.Introduction. 1.1 Background. 1.2 Purpose of sectoral guidelines. 1.3 Structure of the guidelines. 1.4 Using the EIA guidelines. 2. Legal Aspects. 2.1 Introduction. 2.2 Industry sector- Prescribed activities. 2.3 Summary of relevant environmental regulations and guidelines. 3. Integrated project planning. 3.1 Introduction. 3.2 Purpose of the EIA. 3.3 Benefits from the use of EIA as a management tool. 3.4 The EIA process and the project cycle. 3.5 Roles and responsibilities. 3.6 Important principles for managing an EIA. 4. Site selection and project options. 4.1 Introduction. 4.2 Data requirements. 4.3 Project options. 4.4 Site selection. 4.5 General site selection criteria-industry projects. 5. Scoping. 5.1 Introduction. 5.2 Elements of scoping. 5.3 Approach to scoping. 5.4 Terms of reference for the EIA. 6. Environmental baseline data. 6.1 Introduction. 6.2 Construction of the database. 6.3 Key sector data needs. 6.4 Basic information pertaining to prescribed activity projects. 7. Prediction and evaluation of impacts. 7.1 Introduction. 7.2 Assessment methodology. 7.3 Evaluation of impacts. 7.4 The needs for detailed EIA studies. 8. Mitigation and abatement measures. 8.1 Introduction. 8.2 Types of mitigation. 8.3 The mitigation process. 8.4 Implementation mitigation measures. 9. Environmental management. 9.1 Introduction. 9.2 Environmental monitoring and audit (EM&A). 9.3 Safety management systems. 10. The EIA review checklist. 11. EA report format. 11.1 Introduction. 11.2 Format of the EA report.
546 ## - LANGUAGE NOTE
Language note In English
650 10 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Water resources development -
Geographic subdivision Malaysia
651 ## - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME
Geographic name Malaysia -
General subdivision environmental aspects
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type Monograf
Holdings
Withdrawn status Lost status Damaged status Not for loan Collection Home library Current library Shelving location Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
        General Collections JPS HQ Library JPS HQ Library Main Library 22/08/2023   WR-0998 1000019410 22/08/2023 1 22/08/2023 Monograf
        General Collections JPS HQ Library JPS HQ Library Main Library 22/08/2023   WR-0998 1000008500 22/08/2023 1 22/08/2023 Monograf

HUBUNGI KAMI

Perpustakaan Jabatan Pengairan dan Saliran Malaysia (JPS Malaysia)
Aras Bawah, Blok A, Kompleks Ibu Pejabat JPS Malaysia
Persiaran Rimba Permai, Cyber 8
63000 Cyberjaya, Selangor

No Tel : 03 – 2697 3050

Emel : adminlibrary@water.gov.my

MEDIA SOSIAL


KAUNTER PELAWAT

HARI INI MINGGU LEPAS BULAN LEPAS TAHUN LEPAS JUMLAH
today lastweek lastmonth lastyear total

WAKTU PERKHIDMATAN

   Isnin - Khamis  :  8.00 pagi – 5.00 petang
   Jumaat  :  8.00 pagi – 12.15 tengah hari
     2.45 petang - 5.00 petang

   Sabtu, Ahad & Cuti Umum: TUTUP


Paparan terbaik menggunakan Google Chrome dan mozila firefox dengan resolusi 1600 X 900
Hakcipta Terpelihara @2023, Perpustakaan JPS Malaysia
Penafian :Kerajaan Malaysia dan Pihak Jabatan Pengairan dan Saliran Malaysia tidak bertanggungjawab terhadap sebarang kerugian atau kerosakan yang dialami kerana menggunakan maklumat dalam portal ini.

Powered by Koha