Environmental Impact Assessment For Pro. 240 Units Apartment And Surrounding Mixed Resort Devevelopment At Kampung Tanjung Agas, Mukim Pasir Panjang, Port Dickson, Negeeri Sembilan (Record no. 6180)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 03784nam a2200229#a 4500 |
001 - CONTROL NUMBER | |
control field | vtls000008414 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 230822s1995 xx 000 0 eng d |
040 ## - CATALOGING SOURCE | |
Original cataloging agency | JPS |
041 ## - LANGUAGE CODE | |
Language code of text/sound track or separate title | eng |
043 ## - GEOGRAPHIC AREA CODE | |
Geographic area code | a-my-- |
090 00 - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) | |
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) | WR-0989 |
003 - CONTROL NUMBER IDENTIFIER | |
control field | JPS |
110 ## - MAIN ENTRY--CORPORATE NAME | |
Corporate name or jurisdiction name as entry element | UTEG Consultants Sdn. Bhd. Kuala Lumpur. |
245 #0 - TITLE STATEMENT | |
Title | Environmental Impact Assessment For Pro. 240 Units Apartment And Surrounding Mixed Resort Devevelopment At Kampung Tanjung Agas, Mukim Pasir Panjang, Port Dickson, Negeeri Sembilan |
260 ## - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE | |
Place of production, publication, distribution, manufacture | Kuala Lumpur: |
Name of producer, publisher, distributor, manufacture | UTEG Consultants Sdn. Bhd. Kuala Lumpur, |
Date of production, publication, distribution, manufacture | 1995 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | various paging |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | 1. Introduction. 1.1 Project title. 1.2 Project location. 1.3 Authorization. 1.4 Objectives. 1.5 Project justification. 2. Project description. 2.1 Site location and layout plan. 2.2 Landuse of the project site. 2.3 Project background. 2.4 Project processes and activities. 2.5 Proposed implementation schedule. 2.6 Project option. 2.6.1 No. Project option. 3. Existing environment- physical system. 3.1 Introduction. 3.2 Landuse. 3.3 Climate and meteorology. 3.3.1 General. 3.3.2 Surface wind. a) wind speed. b) Wind direction. c) Sunshine. d) Temperature. e) Relative humidity. f) Rainfall and raindays. 3.3.3 Conclusion. 3.4 Geology. 3.5 Air quality and noise. 3.5.1. Air quality. 3.5.2. Noise. 3.6 Water quality. 3.6.1 Introduction. 3.6.2 Water quality measurement. 3.6.2.1 Physical parameter. 3.6.2.2. Oil and Grease. 3.6.2.3. Dissolved oxygen(DO). 3.6.4. Biological oxygen demand (BOD) and chemical oxygen demand (COD). 3.6.5. Ammoniacal nitrogen and coliform. 3.6.2.6 Heavy metals. 3.6.3. Conclusion. 4. Existing environment: Biological system. 4.1 General introduction. 4.2 The terrestrial flora. 4.2.1 The mangrove and coastal flora. 4.2.2 Other riparian flora. 4.3 Wildlife and other Fauna. 4.3.1 Mammals and other vertebrates. 4.3.2 Birds. 4.3.3. Reptiles and Amphibian. 4.3.4 Fisheries. 4.3.5 Insect and other marine invertebrates. 5. Socio-economic systems. 5.1 Introduction. 5.2 The proposed project site. 5.3 Methodology. 5.4 Existing population. 5.5 Landuse and settlement pattern.5.6 Economic characteristic. 5.7 Housing. 5.8 Infrastructure and untility. 5.9. Social facilities. 6. Potential impacts and mitigating measures during construction. 6.1 Introduction. 6.2 The potential impacts. 6.2.1 Base camp. 6.2.2 Access roads and stream crossings. 6.2.3 Site clearing and earthworks. |
-- | 6.2.4 Transportation of material. 6.2.5 Land filling. 6.2.6. Fuel storage. 6.2.7 Solid waste disposal. 6.2.8 Sewage disposal. 6.2.9 Landscaping and revegetation. 6.2.10 Trees cutting. 6.3 Mitigating measures. 6.3.1 Base camps. 6.3.2 Access roads and stream crossings. 6.3.3 Site clearing and earthworks. 6.3.4 Transportation of material. 6.3.5 Land filling. 6.3.6. Fuel storage. 6.3.7 Solid waste disposal. 6.3.8 Sewage disposal. 6.3.9 Landscaping and revegetation. 6.3.10 Trees cutting. 7. Potential impacts and mitigating measures during operation. 7.1 Introduction. 7.2 The potential impacts. 7.2.1 Employment. 7.2.2 Garbage disposal. 7.2.3 Sewage disposal. 7.2.4 Transportation of traffic. 7.2.5 Utilities, Services and amenities. 7.2.6 Pest control. 7.2.7 Abandonment. 7.3. Mitigating measures. 7.3.1 Employment. 7.3.2 Garbage disposal. 7.3.3 Sewage disposal. 7.3.4 Transportation of traffic. 7.3.5 Utilities, Services and amenities. 7.3.6 Pest control. 7.3.7 Mangrove conversation. 7.3.8 Abandonment. 8. Residual impacts and monitoring program. 8.1 Introduction. 8.2 Physical systems. 8.2.1 Air quality & noise. 8.2.2 Water quality. |
546 ## - LANGUAGE NOTE | |
Language note | In English |
650 10 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | Water Resources |
651 ## - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME | |
Geographic name | Malaysia - |
General subdivision | environmental aspects |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Koha item type | Monograf |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection | Home library | Current library | Shelving location | Date acquired | Total checkouts | Full call number | Barcode | Date last seen | Copy number | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General Collections | JPS HQ Library | JPS HQ Library | Main Library | 22/08/2023 | WR-0989 | 1000012364 | 22/08/2023 | 1 | 22/08/2023 | Monograf |