ESTIMATING AND COSTING PRE-CAST CONCRETE PRODUCTS AND CAST STONE (Record no. 3380)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 01557nam a2200217#a 4500 |
001 - CONTROL NUMBER | |
control field | vtls000004935 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 230822s1943 xx 000 0 eng d |
040 ## - CATALOGING SOURCE | |
Original cataloging agency | JPS |
090 00 - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) | |
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) | BUILD 691.32 FIE |
003 - CONTROL NUMBER IDENTIFIER | |
control field | JPS |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | FIELDER, F.H. |
Relator term | author |
245 #0 - TITLE STATEMENT | |
Title | ESTIMATING AND COSTING PRE-CAST CONCRETE PRODUCTS AND CAST STONE |
260 ## - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE | |
Place of production, publication, distribution, manufacture | LONDON: CONCRETE PUBLICATIONS LIMITED, |
Date of production, publication, distribution, manufacture | 1943 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | 153P; ILLUST |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Chapter 1: Enquiries. Chapter 2: Quantities. Chapter 3: Calculation of areas and volumes. Chapter 4: Measurement. Chapter 5: Material quantities and costs. Chapter 6: Prices. Chapter 7: Labour costs. Chapter 8: Labour in mixing. Chapter 9: Labour charges in casting. Chapter 10: Finishing costs of cast stone and sundry items. Chapter 11: Effect of weight, repetition, reinforcement and moulds. Chapter 12: Examples of estimating labour and material costs. Chapter 13: Cost of moulds. Chapter 14: Combined timber and labour charges for moulds and examples of estimates. Chapter 15: Reinforcement. Chapter 16: Reinforcement material and labour costs. Chapter 17: Overhead charges and profit. Chapter 18: Carriage charges. Chapter 19: Examples of co-ordinating estimates. Chapter 20: Examples of co-ordinating estimates for cost stone masonary. Chapter 21: Co-ordinate estimates in Tabulated form. |
546 ## - LANGUAGE NOTE | |
Language note | ENG |
650 10 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | CONCRETE. |
650 20 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | PRECAST CONCRETE. |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Koha item type | Monograf |
990 ## - EQUIVALENCES OR CROSS-REFERENCES [LOCAL, CANADA] | |
Link information for 9XX fields | 1943 |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection | Home library | Current library | Shelving location | Date acquired | Total checkouts | Full call number | Barcode | Date last seen | Copy number | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General Collections | JPS HQ Library | JPS HQ Library | Main Library | 22/08/2023 | BUILD 691.32 FIE | 1000000931 | 22/08/2023 | 1 | 22/08/2023 | Monograf |