REINFORCED CONCRETE PILING

WENTWORTH-SHIELDS, F.E.

REINFORCED CONCRETE PILING - London: Concrete Publications limited, 1938 - 126p; illus

Chapter 1: Introductory. 1.1 Material. 1.2 Concrete proportions. 1.3 Shape of cross section. 1.4 Cover reinforcement. 1.5 Pile shoes. Chapter 2: Design of piles. 2.1 Strength. 2.2 Bearing piles. 2.3 Column strength. 2.4 Tapered piles. 2.4 Stresses during driving. 2.5 Bending moments caused by lifting piles. 2.6 Stresses caused by lifting square and rectangular piles. 2.7 Stresses caused by lifting octangol piles. 2.8 Effect of age on strength. Chapter 3: Groups of bearing piles. 3.1 Pile caps. Chapter 4: Sheeting pile, anchorages and retaining walls. 4.1 Piled retaining walls. 4.2 Anchor ties. 4.3 Anchorage by piled frames. 4.4 Stability of a piled retaining wall. 4.4 Lateral pressure and resistance of earth. 4.5 Stability of a piled retaining wall. 4.6 Lateral pressure and resistance of earth. 4.7 Length and strength of piles resist earth pressure. 4.8 Length of anchor ties. 4.9 Area of anchors. 4.9 Stability of piled frames. Chapter 5: Jetties and fenders. 5.1 Piled frames for jetties. 5.2 Fenders for wharves and jetties. Chapter 6: Piling in sea-water. Chapter 7: Specification for piles and measurement. 7.1 Cement. 7.2 Aggregate. 7.3 Reinforcement. 7.4 Moulds. 7.5 Concrete. 7.6 Manufactures of reinforced concrete piles. 7.7 Driving. 7.8 Lengthening. 7.9 Measurement. Chapter 8: Construction methods. 8.1 Arrangement of pile making Yard. 8.2 Aggregates. 8.3 Cement storage. 8.4 Building skeletons. 8.5 Moulds. 8.6 Mixing concrete. 8.7 Conveying and pouring concrete. 8.8 Curing and stacking. 8.9 Age for handling and driving. 8.10 Vibration of concrete. 8.11 Pile frames. 8.12 Winches. 8.13 Drop hammers. 8.14 Single acting steam hammers. 8.15 Double acting steam hammers. 8.16 Helmets. 8.17 Cushions and dollies. 8.18 Lengthening and re-driving. 8.19 Pile connections. 8.20 Cutting off pile heads with explosives. Chapter 9: Cast in-situ piles. Chapter 10: Description of piling works. 10.1 Hamworthy wharf. 10.2 Floating dock, Southampton. 10.3 Deep-water quay at hare. 10.4 Groynes at Bournemouth. 10.5 Pile Yard at Southampton docks. 10.6 Pile Yard at Manchester ship canal. 10.7 Large pile driving machine.


ENG


PILE FOUNDATIONS.
FOUNDATION ENGINEERING.
PILING.

HUBUNGI KAMI

Perpustakaan Jabatan Pengairan dan Saliran Malaysia (JPS Malaysia)
Aras Bawah, Blok A, Kompleks Ibu Pejabat JPS Malaysia
Persiaran Rimba Permai, Cyber 8
63000 Cyberjaya, Selangor

No Tel : 03 – 2697 3050

Emel : adminlibrary@water.gov.my

MEDIA SOSIAL


KAUNTER PELAWAT

HARI INI MINGGU LEPAS BULAN LEPAS TAHUN LEPAS JUMLAH
today lastweek lastmonth lastyear total

WAKTU PERKHIDMATAN

   Isnin - Khamis  :  8.00 pagi – 5.00 petang
   Jumaat  :  8.00 pagi – 12.15 tengah hari
     2.45 petang - 5.00 petang

   Sabtu, Ahad & Cuti Umum: TUTUP


Paparan terbaik menggunakan Google Chrome dan mozila firefox dengan resolusi 1600 X 900
Hakcipta Terpelihara @2023, Perpustakaan JPS Malaysia
Penafian :Kerajaan Malaysia dan Pihak Jabatan Pengairan dan Saliran Malaysia tidak bertanggungjawab terhadap sebarang kerugian atau kerosakan yang dialami kerana menggunakan maklumat dalam portal ini.

Powered by Koha