PERKHIDMATAN PERUNDING BAGI REKABENTUK TERPERINCI RANCANGAN TEBATAN BANJIR KUALA TERENGGANU UTAMA (UMT) DAN KAWASAN SEKITAR, TERENGGANU : FINAL DETAILED, April 2022 //
PERKHIDMATAN PERUNDING BAGI REKABENTUK TERPERINCI RANCANGAN TEBATAN BANJIR KUALA TERENGGANU UTAMA (UMT) DAN KAWASAN SEKITAR, TERENGGANU : FINAL DETAILED, April 2022 //
RPM Engineers Sdn Bhd
- Various pagings : illustrations, charts,colour photographs, colour maps 30 cm
1 Introduction--2 Data and Information--3 Review of Previous Studies--4 Flood Assessment--5 Hydrological Analysis--6 Hydraulic Analysiis--7 Proposed Flood Mitigation Options--8 Disclussion & Evaluation--9 Work Components and Cost Estimates
In English
Drainage--Design and construction ---Kuala Terengganu, Terengganu
Flood Mitigation ---Kuala Terengganu, Terengganu
Government publications ---Malaysia
1 Introduction--2 Data and Information--3 Review of Previous Studies--4 Flood Assessment--5 Hydrological Analysis--6 Hydraulic Analysiis--7 Proposed Flood Mitigation Options--8 Disclussion & Evaluation--9 Work Components and Cost Estimates
In English
Drainage--Design and construction ---Kuala Terengganu, Terengganu
Flood Mitigation ---Kuala Terengganu, Terengganu
Government publications ---Malaysia