Detailed design of Sabo dam works in the state of Perak Darul Ridzwan Final Report

Detailed design of Sabo dam works in the state of Perak Darul Ridzwan Final Report - Kuala Lumpur : Jurutera Perunding Zaaba , 2008 - Various pgs, illust, 28 cm

Final Report Sg Meru Dam 1 Sg Meru Dam 2 Gua Tempurung Dam 1 Gua Tempurung Dam 2


eng


Water Resources
CONSTUDY
DESIGN OF DAM
SABO

HUBUNGI KAMI

Perpustakaan Jabatan Pengairan dan Saliran Malaysia (JPS Malaysia)
Aras Bawah, Blok A, Kompleks Ibu Pejabat JPS Malaysia
Persiaran Rimba Permai, Cyber 8
63000 Cyberjaya, Selangor

No Tel : 03 – 2697 3050

Emel : adminlibrary@water.gov.my

MEDIA SOSIAL


KAUNTER PELAWAT

HARI INI MINGGU LEPAS BULAN LEPAS TAHUN LEPAS JUMLAH
today lastweek lastmonth lastyear total

WAKTU PERKHIDMATAN

   Isnin - Khamis  :  8.00 pagi – 5.00 petang
   Jumaat  :  8.00 pagi – 12.15 tengah hari
     2.45 petang - 5.00 petang

   Sabtu, Ahad & Cuti Umum: TUTUP


Paparan terbaik menggunakan Google Chrome dan mozila firefox dengan resolusi 1600 X 900
Hakcipta Terpelihara @2023, Perpustakaan JPS Malaysia
Penafian :Kerajaan Malaysia dan Pihak Jabatan Pengairan dan Saliran Malaysia tidak bertanggungjawab terhadap sebarang kerugian atau kerosakan yang dialami kerana menggunakan maklumat dalam portal ini.

Powered by Koha