000 | 01392nam a2200325#i 4500 | ||
---|---|---|---|
001 | vtls000025722 | ||
008 | 230822s2021 xx 000 0 eng d | ||
020 | _a9789839304732 | ||
040 |
_aJPS _beng _cJPS _erda |
||
041 | _aeng | ||
043 | _aa-my-- | ||
080 | _a621.3 | ||
090 | 0 | 0 | _aJPS 621.3 MEC |
110 |
_aMalaysia. _bMechanical and Electrical Services Division _eissuing body |
||
245 | 0 |
_aMECHANICAL AND ELECTRICAL PROCEDURE (MEP1.7) _bTESTING AND COMMISSIONING OF ELECTRICAL SUBMERSIBLE PUMP |
|
264 | 1 |
_aKuala Lumpur : _bJabatan Pengairan dan Saliran Malaysia, _c2021 |
|
264 | 4 | _c©2021 | |
300 |
_ax, 82 pages : _bcolour illustrations ; _c30 cm |
||
336 |
_atext _2rdacontent |
||
337 |
_aunmediated _2rdamedia |
||
338 |
_avolume _2rdacarrier |
||
504 | _aBibliography: pages 48-50 | ||
505 | _a1 INTRODUCTION -- 2 PUMP SYSTEM AND INSTALLATION INSPECTION -- 3 ELECTRICAL TESTING -- 4 PUMP ENDURANCE TEST -- 5 PUMPING SYSTEM PERFORMANCE TEST -- 6 PUMP OPERATION TEST -- REFERENCES -- APPENDICES | ||
546 | _aIn English | ||
650 | 1 | 0 | _aELECTRICAL ENGINEERING |
650 | 2 | 0 |
_aSubmersible pumps _xTesting |
710 | _aDepartment of Irrigation and Drainage (DID) | ||
942 | _cTJPS | ||
999 |
_aVIRTUA40 _aVTLSSORT0010*0030*0050*0080*0200*0390*0400*0410*0430*0490*0800*0900*1100*2450*2640*2641*3000*3360*3370*3380*5040*5050*5460*6500*6501*7100*9050*9051*9992 _c21344 _d21344 |
||
003 | JPS |