000 01814nam a2200313#i 4500
001 vtls000025601
008 230822s2021 xx 000 0 eng d
040 _aJPS
_beng
_cJPS
_erda
041 _aeng
043 _aa-my--
090 0 0 _aCS-SK079
110 _aPERUNDING AZRA ,
_eissuing bosy
245 0 _aCOASTAL HYDRAULIC STUDY FOR " PENAMBAHAN FLOATING JETTY DI JETI KOMPLEKS MATIRIM TUN ABAG SALAHUDDIN (KOMTAS), MUARA TEBAS, KUCHING, SARAWAK' FINAL REPORT - REVISION 1 (APRIL 2021)//
_cPERUNDING AZRA
250 _aREVISION 1
264 1 _aKuching :
_bPERUNDING AZRA ,
_c2021
300 _avii, variuos paging :
_bcolour illustration, colour maps, colour photographs, charts ;
_c30 cm
336 _atext
_2rdacontent
337 _aunmediated
_2rdamedia
338 _avolume
_2rdacarrier
505 _a1 INTRODUCTION -- 2 PROJECT DESCRIPTION -- 3 EXISTING SITE CONDITION -- 4 DATA COLLECTION -- 5 NUMERIAL MODELLING -- 6 HYDRODYNAMIC IMPACT ASSESSMENT -- 7 WAVE IMPACT ASSESSMENT -- 8 SEDIMENT TRANSPORT IMPACT ASSESSMENT -- 9 SEDIMENT PLUME IMPACT ASSESSMENT -- 10 CONCLUSION, RECOMMENDATION AND MITIGATION MEASURES
520 _aThe main objective of this CHS is to invitigate any potential long-term (i.e., change in water level, current speed, wave and sediment transport) and short-term (i.e., the sediment plume during the jetty construction) impacts with respect to the proposes project.
546 _ain English
588 _aTitle from cover page
650 1 0 _aCoastal hyraulic -
_zKuching, Sarawak
650 2 0 _aMitigation measures -
_zKuching, Sarawak
710 _aJabatan kerja Raya Malaysia
942 _cREP
999 _aVIRTUA40
_aVTLSSORT0010*0030*0050*0080*0390*0400*0410*0430*0490*0900*1100*2450*2500*2640*3000*3360*3370*3380*5050*5200*5460*5880*6500*6501*7100*9050*9051*9992
_c21237
_d21237
003 JPS