000 | 01814nam a2200313#i 4500 | ||
---|---|---|---|
001 | vtls000025601 | ||
008 | 230822s2021 xx 000 0 eng d | ||
040 |
_aJPS _beng _cJPS _erda |
||
041 | _aeng | ||
043 | _aa-my-- | ||
090 | 0 | 0 | _aCS-SK079 |
110 |
_aPERUNDING AZRA , _eissuing bosy |
||
245 | 0 |
_aCOASTAL HYDRAULIC STUDY FOR " PENAMBAHAN FLOATING JETTY DI JETI KOMPLEKS MATIRIM TUN ABAG SALAHUDDIN (KOMTAS), MUARA TEBAS, KUCHING, SARAWAK' FINAL REPORT - REVISION 1 (APRIL 2021)// _cPERUNDING AZRA |
|
250 | _aREVISION 1 | ||
264 | 1 |
_aKuching : _bPERUNDING AZRA , _c2021 |
|
300 |
_avii, variuos paging : _bcolour illustration, colour maps, colour photographs, charts ; _c30 cm |
||
336 |
_atext _2rdacontent |
||
337 |
_aunmediated _2rdamedia |
||
338 |
_avolume _2rdacarrier |
||
505 | _a1 INTRODUCTION -- 2 PROJECT DESCRIPTION -- 3 EXISTING SITE CONDITION -- 4 DATA COLLECTION -- 5 NUMERIAL MODELLING -- 6 HYDRODYNAMIC IMPACT ASSESSMENT -- 7 WAVE IMPACT ASSESSMENT -- 8 SEDIMENT TRANSPORT IMPACT ASSESSMENT -- 9 SEDIMENT PLUME IMPACT ASSESSMENT -- 10 CONCLUSION, RECOMMENDATION AND MITIGATION MEASURES | ||
520 | _aThe main objective of this CHS is to invitigate any potential long-term (i.e., change in water level, current speed, wave and sediment transport) and short-term (i.e., the sediment plume during the jetty construction) impacts with respect to the proposes project. | ||
546 | _ain English | ||
588 | _aTitle from cover page | ||
650 | 1 | 0 |
_aCoastal hyraulic - _zKuching, Sarawak |
650 | 2 | 0 |
_aMitigation measures - _zKuching, Sarawak |
710 | _aJabatan kerja Raya Malaysia | ||
942 | _cREP | ||
999 |
_aVIRTUA40 _aVTLSSORT0010*0030*0050*0080*0390*0400*0410*0430*0490*0900*1100*2450*2500*2640*3000*3360*3370*3380*5050*5200*5460*5880*6500*6501*7100*9050*9051*9992 _c21237 _d21237 |
||
003 | JPS |