000 01396nam a2200325#i 4500
001 vtls000025435
008 230822s2023 xx 000 0 eng d
040 _aJPS
_beng
_cJPS
_erda
041 _aeng
043 _aa-my---
080 _a625.123
090 0 0 _aCE 625.123 HSS
110 _aHSS Integrated,
_eissuing body
245 0 _aMALAYSIA EAST COAST RAILWAY LINK PROJECT PRELIMINARY DESIGN CH0+000 ~ CH27+462 :
_bPRELIMINARY DESIGN DRAWINGS OF DRAINAGE AND CULVERT BUKIT BESI SPURLINE/
_cHSS Integrated
264 1 _a[place of publication not identified]:
_b[publisher not identified],
_c[date of publication not identified]
300 _aVarious pagings:
_bcolour illustrations, design;
_c30 cm.
336 _atext
_2rdacontent
337 _aunmediated
_2rdamedia
338 _avolume
_2rdacarrier
500 _aStrictly for internal reference only
546 _aIn English
588 _aTitle from cover page
650 1 0 _aRailway area (planning) -
_zTerengganu
650 2 0 _aRailway engineering -
_zTerengganu
710 _aChina Communications Construction Company Limited,
_eissuing body
710 _aMalaysia Rail Link,
_eissuing body
710 _aSuruhanjaya Pengangkutan Awam Darat,
_eissuing body
942 _cMONO
999 _aVIRTUA40
_aVTLSSORT0080*0400*0410*0430*0490*0800*0900*1100*2450*2640*3000*3360*3370*3380*5000*5460*5880*6500*6501*7102*7100*7101*9050*9992
_c21138
_d21138
003 JPS