000 | 01396nam a2200325#i 4500 | ||
---|---|---|---|
001 | vtls000025435 | ||
008 | 230822s2023 xx 000 0 eng d | ||
040 |
_aJPS _beng _cJPS _erda |
||
041 | _aeng | ||
043 | _aa-my--- | ||
080 | _a625.123 | ||
090 | 0 | 0 | _aCE 625.123 HSS |
110 |
_aHSS Integrated, _eissuing body |
||
245 | 0 |
_aMALAYSIA EAST COAST RAILWAY LINK PROJECT PRELIMINARY DESIGN CH0+000 ~ CH27+462 : _bPRELIMINARY DESIGN DRAWINGS OF DRAINAGE AND CULVERT BUKIT BESI SPURLINE/ _cHSS Integrated |
|
264 | 1 |
_a[place of publication not identified]: _b[publisher not identified], _c[date of publication not identified] |
|
300 |
_aVarious pagings: _bcolour illustrations, design; _c30 cm. |
||
336 |
_atext _2rdacontent |
||
337 |
_aunmediated _2rdamedia |
||
338 |
_avolume _2rdacarrier |
||
500 | _aStrictly for internal reference only | ||
546 | _aIn English | ||
588 | _aTitle from cover page | ||
650 | 1 | 0 |
_aRailway area (planning) - _zTerengganu |
650 | 2 | 0 |
_aRailway engineering - _zTerengganu |
710 |
_aChina Communications Construction Company Limited, _eissuing body |
||
710 |
_aMalaysia Rail Link, _eissuing body |
||
710 |
_aSuruhanjaya Pengangkutan Awam Darat, _eissuing body |
||
942 | _cMONO | ||
999 |
_aVIRTUA40 _aVTLSSORT0080*0400*0410*0430*0490*0800*0900*1100*2450*2640*3000*3360*3370*3380*5000*5460*5880*6500*6501*7102*7100*7101*9050*9992 _c21138 _d21138 |
||
003 | JPS |