000 01345nam a2200229#i 4500
001 vtls000025323
008 230822s2018 xx 000 0 eng d
020 _qhardback
_cfree
040 _aJPS
_beng
_cJPS
_erda
080 _a627.82 (595.33)
090 0 0 _aCS-KN293
245 0 _aFORMAL SAFETY INSPECTION BUKIT KWONG DAM, NEGERI DARUL NAIM 2018
264 1 _aKuala Lumpur :
_bJabatan Pengairan dan Saliran Malaysia ,
_c2018
300 _a1 volume (various pagings) :
_bcolour illustrations, photographs, maps ;
_c30 cm +
_e1 Optical computer disc
336 _atext
_2rdacontent
337 _aunmediated
_2rdamedia
338 _avolume
_2rdacarrier
505 _aCHAPTER 1 INTRODUCTION -- CHAPTER 2 PROJECT APPRECIATION -- CHAPTER 3 APPROACH AND METHODOLOGY -- CHAPTER 4 DOCUMENT REVIEW -- CHAPTER 5 HYDROLOGY AND HYDRAULIC STUDY -- CHAPTER 6 GEOLOGY -- CHAPTER 7 GEOTECHNICAL ANALYSIS -- CHAPTER 8 ON-SITE SAFETY INSPECTION AND IN SITU TESTING -- CHAPTER 9 MONITORING -- CHAPTER 10 TECHNICAL & ELECTRICAL COMPONENTS -- CHAPTER 11 DAM SAFETY SURVEILLANCE -- CHAPTER 12 CONCLUSION AND RECOMMENDATION -- CHAPTER 13 COST ESTIMATION.
710 _aMalaysia.
_bJabatan Pengairan dan Saliran Malaysia ,
_eissuing body.
942 _cREP
999 _aVIRTUA40
_aVTLSSORT0080*0200*0400*0800*0900*2450*2640*3000*3360*3370*3380*5050*7100*9050*9051*9992
_c21058
_d21058
003 JPS