000 | 01368nam a2200229#i 4500 | ||
---|---|---|---|
001 | vtls000025322 | ||
008 | 230822s2018 xx 000 0 eng d | ||
040 |
_aJPS _beng _cJPS _erda |
||
080 | _a627.82 (595.24) | ||
090 | 0 | 0 | _aCS-NS049 |
245 | 0 | _aFORMAL SAFETY INSPECTION UPPER MUAR/TALANG DAM, NEGERI SEMBILAN DARUL KHUSUS 2018 | |
264 | 1 |
_aKuala Lumpur : _bJabatan Pengairan dan Saliran Malaysia , _c2018 |
|
300 |
_a1 volume (various pagings) : _bcolour illustrations, photographs, maps ; _c30 cm _e+ 1 computer optical disc |
||
336 |
_atext _2rdacontent |
||
337 |
_aunmediated _2rdamedia |
||
338 |
_avolume _2rdacarrier |
||
505 | _aCHAPTER 1 INTRODUCTION -- CHAPTER 2 PROJECT APPRECIATION -- CHAPTER 3 APPROACH AND METHODOLOGY -- CHAPTER 4 DOCUMENT REVIEW -- CHAPTER 5 HYDROLOGY AND HYDRAULIC STUDY -- CHAPTER 6 GEOLOGY -- CHAPTER 7 GEOTECHNICAL ANALYSIS -- CHAPTER 8 ON-SITE SAFETY INSPECTION AND IN SITU TESTING -- CHAPTER 9 MONITORING -- CHAPTER 10 TECHNICAL & ELECTRICAL COMPONENTS -- CHAPTER 11 DAM SAFETY SURVEILLANCE -- CHAPTER 12 CONCLUSION AND RECOMMENDATION -- CHAPTER 13 COST ESTIMATION. | ||
650 | 1 | 0 |
_aDams _zNegeri Sembilan |
710 |
_aMalaysia. _bJabatan Pengairan dan Saliran Malaysia, _eissuing body. |
||
942 | _cREP | ||
999 |
_aVIRTUA40 _aVTLSSORT0080*0400*0800*0900*2450*2640*3000*3360*3370*3380*5050*6500*7100*9050*9051*9992 _c21057 _d21057 |
||
003 | JPS |