000 02938nam a2200241#a 4500
001 vtls000000205
008 230822s1983 xx 000 0 eng d
020 _a0-946466-009
040 _aJPS
090 0 0 _aHYDR 626.21 CHA
100 _aFARRADAY,R.V.
_eauthor
245 0 _aHYDRAULIC FACTORS IN BRIDGE DESIGN BY R.V. FARRADAY AND F.G.CHARLTON
260 _aOXFORDSHIRE: THE HYDRAULIC RESEARCH STATION LIMITED,
_c1983
300 _a102 P.; ILLUS
505 _aChapter 1 - River morphology. 1.1 - Introduction, Channel stability, 1.2 - Channel pattern, 1.3 - Effect of bridges on river regime, 1.4 - Hydraulic geometry of river channels, 1.5 - Maximum channel depth. Chapter 2 - Site reconnaissance survey. 2.1 - Introduction, 2.2 - Site selection, 2.3 - Reconnaissance survey, 2.4 - Examination of available records, 2.5 - Field inspection. Chapter 3 - Hydrographic and hydraulic surveys. 3.1 - Introduction, 3.2 - Hydrographic surveys, 3.3 - Hydraulic surveys, 3.4 - Sampling and grading procedure. Chapter 4 - Estimation of design discharge and water level. 4.1 - Introduction, 4.2 - Flood return period, 4.3 - Method of assessing design discharge and water level, 4.4 - Effect of bridge structure on water level. Chapter 5 - Local scour at bridge crossings. 5.1 - Introduction, 5.2 - Local scour at bridge piers, 5.3 - Local scour at abutment and training works. Chapter 6 - Forces on bridge piers. 6.1 - Introduction, 6.2 - Hydrodynamic forces, 6.3 - Ice forces, 6.4 - Debris forces, 6.5 - Impact forces due to ship collision. Chapter 7 - Bank protection and river training. 7.1 - Introduction, 7.2 - Protection of foundations against scour, 7.3 - Protection of river banks. Chapter 8 - Physical hydraulic models. 8.1 - Introduction, 8.2 - Model types, 8.3 - Models application, 8.4 - Summary of situations in which a model investigation is advisable. Chapter 9 - Influence of hydraulic factors on the design of bridges over rivers. 9.1 - Introduction, 9.2 - Hydraulic factors in a typical bridge design procedure. Chapter 10 - Case histories. 10.1 - Introduction, 10.2 - Kaduna River crossing, Wuya, Nigeria, 10.3 - The Ahmad Shah bridge, Temerloh, Malaysia,
_a10.4 - The Jhelum bridge, Pakistan, 10.5 - The Fallujah bridge, Iraq, 10.6 - Case histories to illustrate the importance of temporary river works design. Chapter 11- Further research. Appendix A - Coefficient for the assessment of hydrodynamic forces on bridge piers. Appendix B - Parameter value used in assessing ice forces. Appendix C - Conversion of the volume of deformed steel at the collision point R into a depth of damage penetration P. Appendix D - Notation.
546 _aENG
650 1 0 _aHydraulic engineering
650 2 0 _aBRIDGES - DESIGN.
700 _aCharlton, F.G.
942 _cMONO
990 _a1983
999 _a05273
_a624.21 CHA
_aVIRTUA00
_aVTLSSORT0080*0200*0900*1000*2450*2600*3000*5050*5051*5460*6500*6501*7000*9040*9050*9490*9900*9993
_c181
_d181
003 JPS