000 | 01217nam a2200205#a 4500 | ||
---|---|---|---|
001 | vtls000022627 | ||
008 | 230822s2006 xx 000 0 eng d | ||
040 | _aJPS | ||
090 | 0 | 0 | _aTHESIS CE 624 AHM |
100 |
_aAhmad Anuar Othman _eauthor |
||
245 | 0 |
_aFactors influencing the construction time of public sector civil engineering projects in Malaysia // _cAhmad Anuar Othman |
|
260 |
_aKuala Lumpur : _bUniversiti Teknologi Mara, _c2006 |
||
300 |
_a518p., : _billust, _c30cm |
||
500 | _aThesis submitted in fulfilment of the requirements for the degree of Doctor of Philosophy. | ||
505 | _aCHAPTER 1: Introduction. CHAPTER 2: Literature review on general overview of construction industry. CHAPTER 3: Literature review on construction time performance and project delay. CHAPTER 4: Review of research method and development of reasearch methodology. CHAPTER 5: The first phase study. CHAPTER 6: The second phase study. Chapter 7: The phase study. CHAPTER 8: Discussion of the Findings. CHAPTER 9: Conclusion and recommendations. | ||
546 | _aeng | ||
650 | 1 | 0 |
_aCivil engineering _zMalaysia |
942 | _cTES | ||
999 |
_aVIRTUA _aVTLSSORT0080*0900*1000*2450*2600*3000*5000*5050*5460*6500*9050*9970*9991 _c15034 _d15034 |
||
003 | JPS |