000 01217nam a2200205#a 4500
001 vtls000022627
008 230822s2006 xx 000 0 eng d
040 _aJPS
090 0 0 _aTHESIS CE 624 AHM
100 _aAhmad Anuar Othman
_eauthor
245 0 _aFactors influencing the construction time of public sector civil engineering projects in Malaysia //
_cAhmad Anuar Othman
260 _aKuala Lumpur :
_bUniversiti Teknologi Mara,
_c2006
300 _a518p., :
_billust,
_c30cm
500 _aThesis submitted in fulfilment of the requirements for the degree of Doctor of Philosophy.
505 _aCHAPTER 1: Introduction. CHAPTER 2: Literature review on general overview of construction industry. CHAPTER 3: Literature review on construction time performance and project delay. CHAPTER 4: Review of research method and development of reasearch methodology. CHAPTER 5: The first phase study. CHAPTER 6: The second phase study. Chapter 7: The phase study. CHAPTER 8: Discussion of the Findings. CHAPTER 9: Conclusion and recommendations.
546 _aeng
650 1 0 _aCivil engineering
_zMalaysia
942 _cTES
999 _aVIRTUA
_aVTLSSORT0080*0900*1000*2450*2600*3000*5000*5050*5460*6500*9050*9970*9991
_c15034
_d15034
003 JPS