000 02127nam a2200205#a 4500
001 vtls000002337
008 230822s1973 xx 000 0 eng d
040 _aJPS
090 0 0 _aART 711.16 ILA
110 _aILACO/NEDECO.
245 0 _aLAND CONSOLIDATION PROJECT IN THE CENTRAL PLAIN OF THAILAND
260 _aNETHERLANDS:
_bILACO/NEDECO,
_c1973
300 _a98 P.
505 _aChapter 1: Introduction. 1. The assignment. 2. Concept and objectives consolidation. 3. The land consolidation project. Chapter 2: Surveys and maps. 1. Introduction. 2. Aerial survey. 3. Topographical survey. 4. Cadastral survey. 4.1 General. 4.2 Cadarstral survey of actual situation. 4.3 Survey for the issues of title deeds. 5. Soil suitability classification. Chapter 3: Design. 1. Introduction. 2. Layout. 2.1 General. 2.2 Design criteria. 2.3 Design of layout. 3. Reallocation design. 3.1 General. 3.2 Design criteria. 3.3 Reallocation plan. 4. Design of services units. 4.1 General. 4.2 Design criteria. 4.3 Design of irrigation canals and farm roads. 4.4 Design of structures. 4.5 Design of drains. Chapter 5: Implementation. 1. Introduction. 2. Staking out. 3. Earthwork. 3.1 General. 3.2 Clearing. 3.3 Land levelling. 3.4 Irrigation canals and drains. 3.5 Farm roads. 3.6 Productivity of earth-moving machinery. 3.7 Earth-moving equipment required. 3.8 Cost of earthwork. 4. Structures. 5. Issues of title deeds. 6. Organization. 6.1 General. 6.2 Governmental implementation with government-owned machinery. 6.3 Government implementation with hired machinery. 6.4 Implementation by contractors with their own equipment. Chapter 5: Operation and maintenance. 1. Introduction. 2. Operation. 2.1 General. 2.2 Information. 2.3 Water allocation. 2.4 Regulation. 3. Maintenance. Chapter 6: Summary of costs. 1. Survey's mapping and issues of title deeds. 2. Earth moving and structures. 3. Summary of land consolidation costs
546 _aENG
650 1 0 _aLAND CONSOLIDATION.
942 _cMONO
990 _a1973
999 _a05027
_a333.013.6 ILA
_aVIRTUA30
_aVTLSSORT0080*0900*1100*2450*2600*3000*5050*5460*6500*9040*9490*9900*9993
_c1472
_d1472
003 JPS