000 01392nam a2200253#a 4500
001 vtls000020187
008 230822s1996 xx 000 0 eng d
020 _a343301292X
040 _aJPS
090 0 0 _aSOS 338.363 MAI
100 _aMaidl, Bernhard
_eauthor
245 0 _aMechanised Sheild Tunnelling
260 _aBerlin :
_bErnst & Sohn,
_c1996
300 _a428p,illust,25cm
505 _a1 Introduction. 2 Surface Settlement and Void Support. 3 Machine Design and Dimensioning. 4 Excavation Tools and Excavation Procedures. 5 Transport Facilities, Separation and Depositing. 6 Tunnel Lining. 7 Tailskin seals, grouting and injection procedure. 8 Open-faced Sheilds. 9 Compressed Air Sheilds. 10 Slurry Sheilds. 11 Earth-pressure Balance Sheilds. 12 Combined Sheilds. 13 Special Configuration Sheilds and Special Construction Sheilds and Special Construction Methods. 14 Controllable Methods in Microtunnel Construction. 15 Surveying and Guidance Systems. 16 Health and Safety. 17 Recommendations For Planning, Tendering and Contract Award in Sheild Tunnelling.
546 _aeng
650 1 0 _aMechanized production
650 2 0 _aProduction by machine
700 _aAnheuser, Lothar
700 _aHerrenknecht, Martin
942 _cMONO
990 _a1996
999 _aVIRTUA
_aVTLSSORT0080*0200*0900*1000*2450*2600*3000*5050*5460*6500*6501*7000*7001*9050*9900*9980*9991
_c13596
_d13596
003 JPS