000 | 00597nam a2200193#a 4500 | ||
---|---|---|---|
001 | vtls000017443 | ||
008 | 230822s2023 xx 000 0 eng d | ||
040 | _aJPS | ||
090 | 0 | 0 | _aIRR0733 |
245 | 4 | _aThe Feasibility Study On Small Reservoir Development In Peninsular Malaysia | |
250 | _aVolume 1 | ||
260 |
_aNippon Koei Co., Ltd. & Pacific Consultants International _c[date of publication not identified] |
||
300 | _a234 pages, tables, charts & drawings, 30 cm | ||
505 | _aMain Text | ||
650 | 1 | 0 | _aDraft Final Report. |
942 | _cMONO | ||
990 | _a1994 | ||
999 |
_aVIRTUA00 _c12553 _d12553 |
||
003 | JPS |