000 00644nam a2200193#a 4500
001 vtls000017161
008 230822s2023 xx 000 0 eng d
040 _aJPS
090 0 0 _aIRR0559
245 0 _aStudy On The Water Shortage Problem In Trans Perak Stage I Irrigation Project
260 _aDID Malaysia
_c[date of publication not identified]
300 _a70 pages, tables, charts & drawings, 30 cm
500 _aFinal Report
650 1 0 _aA report on irrigation supply shortage.
700 _aIr Dr Hiew Kim Loi, Ir Tan Teow Soon, Ir Khoo Chee Ngion & Ir Yap Cheng Ann.
942 _cMONO
990 _a1992
999 _aVIRTUA00
_c12306
_d12306
003 JPS