Planning of Irrigation for Paddy Field in Peninsular Malaysia
- JICA 1984
- p.
1. Analysis of socio-economics. 1.1 Information derived the National resources study in Malaysia and from Dr. Taylor's report. 1.2 Paddy farmersand poverty eradication 1.3 Taylors report. 1.4 Dilemma, problems and strategies. 2. Features of major scheme in peninsular Malaysia. 2.1 Northwest Selangor integrated agriculture development project-Tanjong Karang. 2.2 KADA 2 improvement project Kelantan. 2..3 Northern Terengganu integrated development projects - Pelagat irrigation area. 2.4 Trans- Perak integrated agricultural development project-Stage 1. 3. Planning guidelines for Paddy field irrigation in peninsular Malaysia. 3.1 Introduction. 3.2 Investigation. 3.3 Determination of irrigation water. 3.4. Planning of intake facilities. 3.5 Operation and maintenance of irrigation systems and evaluation of the project. 3.6 Improvement for field instructor. 4. Water balance study in the paddy fields in Tanjong Karang. 4.1 Work schedule and methodology. 4.2 Staff requirements and operation procedure. 4.3 Progress of the study. 4.4 Observation, analysis and conclusion. 4.5 Recommendation for the Future study of water balance in paddy fields. 5. Arable land consolidation. 5.1 Introduction to arable land consolidation works in Japan. 5.2 Some examples and problems in land consolidations in Japan. 5.3 Recommendations. 5.4 Training film for irrigation engineers. 6. NOGYO DOBOKU ? 6.1 What is NOGYO DOBOKU? 6.2 Outlines of activities. 6.3 Introduction to JIIDRE. 6.4 The list of members of Japanese irrigation engineers in Malaysia.