TY - BOOK ED - MegaConsult Sdn.Bhd (MEGA), ED - Malaysia. TI - PENYEDIAAAN PELAN PENGURUSAN LEMBANGAN SUNGAI BERSEPADU (IRBM) SUNGAI DUNGUN, TERENGGANU FINAL REPORT (Volume II: IRBM Study Report), July 2021 / PY - 2021/// CY - Kuala Lumpur PB - Jabatan Pengairan dan Saliran Malaysia KW - Watershed management - KW - Sungai Dungun (Terengganu) KW - River basin - KW - Water supply - N1 - 1 INTRODUCTION -- 2 STUDY AREA -- 3 DATA COLLECTION & MANAGEMENT -- 4 MAIN ISSUES -- 5 STAKEHOLDRE'S PARTICIPATION -- 6 MODELING AND ANALYSIS -- 7 ENSURE SUFFICIENT WATER -- 8 ENSURING CLEAN WATER -- 9 REDUCING DLOOD RISK -- 10 ENHANCE ENVIRONMENTAL CONSERVATION -- 11 SOCIAL, SOCIO-ECONOMIC & LANDUSE PLANNING -- 12 LEGISLATION AND INSTITUTION -- 13 STATE OF THE RIVER REPORT 2020 : DUNGUN RIVER BASIN -- 14 SUMMARY OF STRATEGIC ACTION PLAN -- 15 GEOGRAPHIC INFORMATION SYSTEM & GEODATABASE -- 16 CONCLUSION; Integrated River Basin Management (IRBM) is a process of coordinating conservation, management and development of water, land and related resources across sectors within a given river basin, in order to maximise the economic and social benefits derived from water resources in an equitable manner while preserving, and where necessary, restoring freshwater ecosystems. The IRBM plan ensures that all activities within a river basin can e managed holistically. All the approach and methodologies with clear roles and function in compliance with existing laws and regulations are to be disseminated to all concerned parties for the management and regulation of a river basin. The practice of IRBM is required to be embraced by all agencies as well as interest groups in a river basin. Among the major components of IRBM are planning, control, enforcement, improvement, raising of the public awareness, legislation, institution set-up, and funding ER -