TY - BOOK ED - Megaconsult Sdn. Bhd (MEGA), ED - Malaysia. TI - PENYEDIAAN PELAN PENGURUSAN LEMBANGAN SUNGAI BERSEPADU (IRBM) SUNGAI DUNGUN, TERENGGANU FINAL REPORT : Volume I : Executive Summary, July 2021/ PY - 2021/// CY - Terengganu PB - Jabatan Pengairan dan Saliran Malaysia KW - Watershed management - KW - Sungai Dungun (Terengganu) KW - Water supply - N1 - 1 INTRODUCTION -- 2 PROJECT BACKGROUND -- 3 SCOPE OF WORKS -- 4 PROJECT PLAN -- 5 STUDY AREA -- 6 MAIN ISSUES -- 7 STAKEHOLDERS -- 8 MODELLING AND ANALYSIS -- 9 ENSURING WATER SUFFICIENCY -- 10 ENSURING CLEAN WATER-- 11 REDUCING FLOOD RISK -- 12 ENHANCEMENT OF ENVIRONMENTAL CONSERVATION -- 13 LANDUSE PLANNING -- 14 PUBLIC OUTREACH PROGRAMME -- 15 COST BENEFIT ANALYSIS AND CREATIVITY INDEX -- 16 LEGISLATION AND INSTITUTION -- 17 STATE -OF-THE- RIVER REPORT -- 18 IRBM STRATEGIC ACTION PLAN -- 19 GEOSPATIAL INFORMATION SYSTEM AND GEODATABASE N2 - This Executive Summary has been prepared as an 'Extended summary' for the overall IRBM Study. Where appropriate the key and important elements have been abstracted and summarised in this volume. Nevertheless, the full report should be referred to in order to obtain the full details and context of the study outputs ER -