Fill dam Volume 2: Engineering manual for irrigation and drainage
- The Institute of Irrigation and Drainage, 19--
- 383-534p; illust. 26cm
CONSTRUCTION WORK. Construction Plan and Supervision. The Construction Plan. Construction Supervision. Construction. Preparatory Works and Construction. Facilities. Temporary Diversion Works. Excavation of Dam Base. Foundation Treatment. Fill Dam Embankments. Concrete Structures. Installation of Facilities. SUPERVISION. Initial Ponding of Reservoir. Initial Ponding of Reservoir. Supervision of the Ponding Process. Operation and Maintenance. Operation and Maintenance of Structures. Operational Supervision