Automation of Constant Head Office Off-Take Structure

By: Material type: TextTextPublication details: Kuala Lumpur : Universiti Putra Malaysia, 2005Description: Various paging, Illust., 30cmSubject(s):
Contents:
1. Introduction 1.1 Background 1.2 Statement of the Problem 1.3 Objectives 1.4 Scope of the Study 2 Literature Review 2.1 Growth Stages of Rice Plant 2.2 Automation in Irrigation Projects 2.3 Constant Head Orifice (CHO) Off-take Structure in Irrigation 3 Materials and Methods 3.1 Study Area 3.2 System Configuration and Operating of CHO Automation 3.3 Design Criteria of CHO Automation System 3.4 Development of CHO Control System Software 3.5 Evaluation of System Performance 4 Results and Discussion 4.1 Operation of CHO Automation System 4.2 System Control and Monitoring 4.3 Critical Events Aler and Handling 4.4 Analysis and Verification og the Automated CHO System 5 Conclusions and Recommendations 5.1 Conclusions 5.2 Recommendations for Future Work.
Action note:
  • 09669
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode
Tesis JPS HQ Library Main Library General Collections THESIS HYDR 626.8 HAP (Browse shelf(Opens below)) Available 1000028211
Tesis JPS HQ Library Main Library General Collections THESIS HYDR 626.8 HAP (Browse shelf(Opens below)) Available 1000033585

Includes bibliographical references

1. Introduction 1.1 Background 1.2 Statement of the Problem 1.3 Objectives 1.4 Scope of the Study 2 Literature Review 2.1 Growth Stages of Rice Plant 2.2 Automation in Irrigation Projects 2.3 Constant Head Orifice (CHO) Off-take Structure in Irrigation 3 Materials and Methods 3.1 Study Area 3.2 System Configuration and Operating of CHO Automation 3.3 Design Criteria of CHO Automation System 3.4 Development of CHO Control System Software 3.5 Evaluation of System Performance 4 Results and Discussion 4.1 Operation of CHO Automation System 4.2 System Control and Monitoring 4.3 Critical Events Aler and Handling 4.4 Analysis and Verification og the Automated CHO System 5 Conclusions and Recommendations 5.1 Conclusions 5.2 Recommendations for Future Work.

may/eng

09669

There are no comments on this title.

to post a comment.

HUBUNGI KAMI

Perpustakaan Jabatan Pengairan dan Saliran Malaysia (JPS Malaysia)
Aras Bawah, Blok A, Kompleks Ibu Pejabat JPS Malaysia
Persiaran Rimba Permai, Cyber 8
63000 Cyberjaya, Selangor

No Tel : 03 – 2697 3050

Emel : adminlibrary@water.gov.my

MEDIA SOSIAL


KAUNTER PELAWAT

HARI INI MINGGU LEPAS BULAN LEPAS TAHUN LEPAS JUMLAH
today lastweek lastmonth lastyear total

WAKTU PERKHIDMATAN

   Isnin - Khamis  :  8.00 pagi – 5.00 petang
   Jumaat  :  8.00 pagi – 12.15 tengah hari
     2.45 petang - 5.00 petang

   Sabtu, Ahad & Cuti Umum: TUTUP


Paparan terbaik menggunakan Google Chrome dan mozila firefox dengan resolusi 1600 X 900
Hakcipta Terpelihara @2023, Perpustakaan JPS Malaysia
Penafian :Kerajaan Malaysia dan Pihak Jabatan Pengairan dan Saliran Malaysia tidak bertanggungjawab terhadap sebarang kerugian atau kerosakan yang dialami kerana menggunakan maklumat dalam portal ini.

Powered by Koha